| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditional on specific cementing and completion design for south setback: production liner cemented in lateral with wet shoe and ability to frac out the shoe. ๐ Stipulations section, page 1 Regulatory approval is tied to a specific, non-standard completion technique (cemented liner with wet shoe). This dictates the completion vendor's scope and locks in a specific operational sequence. |
Unknown | Completions / Frac |
| Tier 3 |
Estimated spud date provided to adjacent operator: February 22, 2027.โฐ TIME-SENSITIVE ๐ Letter to Burlington Resources, May 18, 2026 A firm, forward-looking spud date (8+ months from permit approval) is communicated externally. This indicates advanced rig and crew scheduling. |
2027-02-22 | Drilling Rigs |
| Tier 3 |
Formal notice and directional plans provided to adjacent unit operator (Burlington Resources) on May 20, 2026, as required by Order No. 31973 for off-spacing wells. ๐ Drilling Permit Affidavit and attached letter, near end of document Demonstrates proactive regulatory and neighbor compliance for a well that will drill through another operator's unit. This inter-operator coordination is a prerequisite and can involve technical data exchange. |
2026-05-20 | Directional Drilling |
| Tier 3 |
Affidavit confirms Surface Use Agreement executed July 1, 2025, for 'off lease' drilling rights into specific sections, including the target unit (Sections 16, 21 T152N R95W). ๐ Affidavit by Jennings White, near end of document Surface access was secured well in advance (over a year prior to permit date). The agreement explicitly covers 'off lease' (off-spacing) drilling, which is the case for this well, de-risking a major permitting hurdle. |
2025-07-01 | Drilling Rigs |
| Tier 3 |
Waiver requested for standard open hole logs (Acoustic/Sonic, Density/Porosity, Resistivity). Waiver must be requested via separate sundry notice. ๐ Geologic Information / Proposed Logs section, page 3-4 Operator is opting out of routine data acquisition, indicating reliance on offset data or alternative methods (like advanced LWD). This reduces near-term logging vendor opportunity but may increase reliance on specific MWD/LWD vendors for real-time data. |
Unknown | Regulatory / Permitting |
| Tier 3 |
Operator must contact NDIC Field Inspector Tayden Jacobson (701-500-5728) prior to location construction.โฐ TIME-SENSITIVE ๐ Stipulations section, page 1 Explicit, named regulatory point of contact required before pad construction begins. This is a pre-spud gate that creates a specific communication and timing dependency. |
Relative | General Oilfield Services |
| Tier 3 |
Detailed anti-collision procedures disclosed, including use of 'AC guidance reporting from certified well planners', 'real-time corrected surveys', and active geo-steering with Gamma ray to avoid existing wellbores. ๐ Proposed Work section, page 7 Reveals operator's formalized, multi-layered anti-collision protocol exceeding basic requirements. Highlights dependency on specific service types: certified well planning, real-time survey correction, and advanced geo-steering. |
Unknown | Directional Drilling |