๐Ÿ›ข๏ธ AN-Melby- 152-95-1030H-1

HESS BAKKEN INVESTMENTS II, LLC ยท McKenzie County, ND ยท File #43011 ยท Generated 2026-08-22 02:17

API
3305310826
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Wet shoe completion design with ability to frac out the shoe
๐Ÿ“„ Stipulations and Completion Equipment sections
Specific engineered completion technique using cemented liner with wet shoe sub containing rupture pins. Designed to intentionally over-displace cement by 2 bbls and allow first stage to be pumped out the shoe.
Unknown Completions / Frac
Tier 3 Comprehensive engineered pad design with specific construction requirements
๐Ÿ“„ Civil layout plans and notes
Detailed pad design by KLJ Engineering includes 15.69 acre disturbance, 412 LF access road, specific compaction controls (95% Proctor density), cement stabilization (4% by weight), and complex stormwater management with riprap overflow details.
2026-06-25 General Oilfield Services
Tier 3 Off-spacing well requiring surface use agreement affidavit for drilling into adjacent units
๐Ÿ“„ Affidavit by Jennings White and Derek Abrahamsen
Well is intentionally drilled outside its permitted spacing unit (Sections 30,31 T153N R94W and 3,10 T152N R95W) requiring negotiated surface use agreement with landowner and formal notification to adjacent operator (Burlington Resources). Indicates strategic unit development and potential for future similar off-spacing wells.
2026-04-21 General Oilfield Services
Tier 3 Closed mud system with no cuttings pit specified in permit stipulations
๐Ÿ“„ Stipulations section
Non-standard waste management requirement. Most permits allow cuttings pits; this mandates closed system and hauling cuttings to approved facility (confirmed in drilling program).
Unknown Mud / Fluids
Tier 3 Mandatory pre-construction contact with specific NDIC Field Inspectorโฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section
Explicit requirement to contact NDIC Field Inspector Tayden Jacobson (701-500-5728) prior to location construction. Not a generic requirement but specific inspector assignment.
Relative General Oilfield Services
Tier 3 Anti-collision procedures requiring increased survey frequency and real-time monitoring
๐Ÿ“„ Proposed Work section
Hess specifies detailed anti-collision standards including 1.5 minimum separation factor, real-time corrected surveys, gamma ray geo-steering around existing wellbores, and increased survey frequency (every 93'-100').
Unknown Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil Construction & Earthwork
Detailed pad design (Rev 1 issued 03/26) is construction-ready. Requires contractors familiar with KLJ/Hess specs, including cement stabilization, specific compaction requirements, and complex stormwater management. 35,435 CY of excavation/embankment creates immediate earthwork opportunity.
Directional Drilling & Survey Services
Anti-collision requirements (1.5 separation factor, real-time monitoring) and dense offset well environment demand advanced directional capabilities. Scientific Drilling already engaged for planning, but execution services will be needed.
Environmental & Waste Management
Closed mud system mandate eliminates cuttings pits, creating demand for cuttings hauling and approved disposal facilities. Filter sock container requirements and specific erosion control measures (silt fence, fiber rolls, ECB) need immediate implementation post-construction.
Pressure Control Equipment
Specific BOP stack configuration (Cameron 11" 5M) and choke manifold (MI-SWACO) indicate need for specialized pressure control equipment rental and testing services prior to spud.