| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe completion design with ability to frac out the shoe ๐ Stipulations and Completion Equipment sections Specific engineered completion technique using cemented liner with wet shoe sub containing rupture pins. Designed to intentionally over-displace cement by 2 bbls and allow first stage to be pumped out the shoe. |
Unknown | Completions / Frac |
| Tier 3 |
Comprehensive engineered pad design with specific construction requirements ๐ Civil layout plans and notes Detailed pad design by KLJ Engineering includes 15.69 acre disturbance, 412 LF access road, specific compaction controls (95% Proctor density), cement stabilization (4% by weight), and complex stormwater management with riprap overflow details. |
2026-06-25 | General Oilfield Services |
| Tier 3 |
Off-spacing well requiring surface use agreement affidavit for drilling into adjacent units ๐ Affidavit by Jennings White and Derek Abrahamsen Well is intentionally drilled outside its permitted spacing unit (Sections 30,31 T153N R94W and 3,10 T152N R95W) requiring negotiated surface use agreement with landowner and formal notification to adjacent operator (Burlington Resources). Indicates strategic unit development and potential for future similar off-spacing wells. |
2026-04-21 | General Oilfield Services |
| Tier 3 |
Closed mud system with no cuttings pit specified in permit stipulations ๐ Stipulations section Non-standard waste management requirement. Most permits allow cuttings pits; this mandates closed system and hauling cuttings to approved facility (confirmed in drilling program). |
Unknown | Mud / Fluids |
| Tier 3 |
Mandatory pre-construction contact with specific NDIC Field Inspectorโฐ TIME-SENSITIVE ๐ Stipulations section Explicit requirement to contact NDIC Field Inspector Tayden Jacobson (701-500-5728) prior to location construction. Not a generic requirement but specific inspector assignment. |
Relative | General Oilfield Services |
| Tier 3 |
Anti-collision procedures requiring increased survey frequency and real-time monitoring ๐ Proposed Work section Hess specifies detailed anti-collision standards including 1.5 minimum separation factor, real-time corrected surveys, gamma ray geo-steering around existing wellbores, and increased survey frequency (every 93'-100'). |
Unknown | Directional Drilling |