๐Ÿ›ข๏ธ AN-Melby-152-95-1030H-2

HESS BAKKEN INVESTMENTS II, LLC ยท McKenzie County, ND ยท File #43012 ยท Generated 2026-08-22 02:17

API
3305310827
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Production liner cemented in lateral with a 'wet shoe' and ability to 'frac out the shoe' to satisfy north setback requirement.
๐Ÿ“„ Stipulations section, page 1.
Specific engineered completion design (cemented liner with wet shoe) is a permit condition to allow reduced boundary setback. Indicates a planned, non-standard completion technique.
Unknown Completions / Frac
Tier 3 Detailed, engineered civil construction plan with extensive quantities and specifications prepared by KLJ Engineering (Drawing NDP-HBAK-CIV-LAY-01031, Rev 1, issued for construction 03/26).โฐ TIME-SENSITIVE
๐Ÿ“„ Civil layout sheets, plan notes, basis of estimate.
Unusually detailed and recent engineered pad design (Rev 1 issued for construction in March 2026) for a pad of 4 wells. Specifies exact materials, compaction, and erosion control.
2026-03-26 General Oilfield Services
Tier 3 Off-spacing well with executed Surface Use Agreement for drilling into adjacent spacing units (Sections 30,31 T153N R94W and Sections 3,10,16,21 T152N R95W) outside the target unit.
๐Ÿ“„ Affidavit section, pages referencing Surface Use Agreement and off-spacing intent.
Operator has secured surface rights for extended lateral reach into non-owned/adjacent units, indicating strategic land access and unit development planning beyond primary spacing.
2025-07-01 Directional Drilling
Tier 3 Affidavit from Tom Richardson (Hess) dated April 21, 2022, stating Halliburton Energy Services does not use specified diesel fuels in HF activities for Hess Bakken Project.
๐Ÿ“„ Letter following Pressure Control Equipment section.
Long-standing, project-wide vendor pre-selection for stimulation, with a specific regulatory compliance affidavit on file.
2022-04-21 General Oilfield Services
Tier 3 Closed mud system with no cuttings pit specified as a permit condition.
๐Ÿ“„ Stipulations section, page 1.
Non-standard waste handling requirement mandates specific fluid systems and haul-off services, eliminating pit construction.
Unknown Mud / Fluids
Tier 3 Operator asserts use of 'AC guidance reporting from certified well planners' and real-time corrected surveys for anti-collision, with a minimum 1.5 separation factor standard.
๐Ÿ“„ Proposed Work section, page 7.
Explicitly states reliance on certified third-party well planners and real-time survey correction, indicating a formalized, high-standard anti-collision program.
Unknown Directional Drilling
Tier 3 Mandatory pre-construction contact with NDIC Field Inspector Tayden Jacobson (701-500-5728) prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section, page 1.
Unusual specific inspector contact requirement, not a generic notification. Indicates heightened regulatory oversight or site-specific sensitivities.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Earthwork & Pad Construction
Detailed engineered civil plans (Rev 1 issued 03/26) are 'for construction.' Permit approved 06/08/2026. Construction must follow 3-business-day wait after permit publication. Immediate mobilization for pad building is imminent.
Directional Drilling / MWD / Surveying
Complex anti-collision environment with many offset wells. Operator mandates certified well planning (Scientific Drilling) and real-time corrected surveys. High-specification services required for spud and drilling phase.
Cuttings Hauling & Fluid Management
Permit condition mandates 'closed mud system with no cuttings pit.' This creates an immediate need for cuttings hauling to approved facilities and closed-loop fluid handling services upon spud.
Specialized Cementing & Completion Tools
Permit condition requires a 'production liner cemented in lateral with a wet shoe' to allow closer setback. This design necessitates specific liner hanger, cementing, and wet shoe sub services during the completion phase.