| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
South setback approval based on production liner cemented in lateral with wet shoe and ability to frac out the shoe ๐ Page 1 of 10, Stipulations Non-standard setback approval tied to specific completion technique (wet shoe with frac-out capability) |
Unknown | Completions / Frac |
| Tier 3 |
Operator must provide directional drilling and completion plans to Continental Resources, Inc. for wells entering adjacent spacing unit per NDIC Orders 31848 & 31973โฐ TIME-SENSITIVE ๐ Affidavit section, Meaghan Coughlan statement Regulatory requirement for cross-unit coordination with specific competitor; creates information sharing obligation |
2026-04-13 | Directional Drilling |
| Tier 3 |
Anti-collision mitigation plan includes 30' surveys during build/drop/curve sections near existing dry well A. CVANCARA 9-7H ๐ Letter to Todd Holweger, Anti-Collision section Specific survey frequency increase (beyond standard) for collision avoidance; named offset well creates risk management requirement |
2026-04-13 | Directional Drilling |
| Tier 3 |
Well requires drilling in conjunction with another well to justify 2560-acre spacing unit - must meet 1220' setback from east/west boundaries ๐ Page 2 of 10, Conditions of Approval Creates interdependency between wells; operator must coordinate drilling of multiple wells to satisfy regulatory spacing requirements |
Relative | General Oilfield Services |
| Tier 3 |
Mandatory contact with NDIC Field Inspector Robert Stafford prior to location construction ๐ Page 1 of 10, Stipulations Specific inspector named with direct contact requirement; creates regulatory gate before construction |
Unknown | General Oilfield Services |