๐Ÿ›ข๏ธ AJ 30-31-6-7 3H

Phoenix Operating LLC ยท Divide County, ND ยท File #43014 ยท Generated 2026-08-22 02:18

API
3302301825
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Wet shoe design with ability to frac out the toe for south setback compliance
๐Ÿ“„ Stipulations section, Wellbore diagram notes
Non-standard completion design using wet shoe sub with hydraulic toe sleeve backup to meet 150' south boundary setback requirements
Unknown Completions / Frac
Tier 3 Multi-well pad with off-spacing wells requiring surface use agreement affidavit and anti-collision mitigation plan
๐Ÿ“„ Affidavit of Surface Damage Agreement, Anti-Collision Letter
Operator is drilling 6 wells from a pad located outside target spacing units, requiring special regulatory compliance and anti-collision measures with existing dry well A. CVANCARA 9-7H
2026-04-03 Directional Drilling
Tier 3 Mandatory CBL on both 9-5/8" intermediate and 7" production casing
๐Ÿ“„ Stipulations section
Double cement bond log requirement beyond standard regulatory minimums
Unknown General Oilfield Services
Tier 3 Mandatory pre-construction contact with NDIC Field Inspector Robert Staffordโฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section
Specific inspector named with direct contact requirement before location construction begins
Relative General Oilfield Services
Tier 3 Closed mud system with cuttings disposal to specific licensed facility
๐Ÿ“„ Stipulations, Disposal of Drill Cuttings section
Explicit requirement for closed loop system and named disposal facility (Smoky Butte Environmental LLC)
Unknown Mud / Fluids

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Survey Services
Complex 6-well pad with anti-collision requirements; Taktikal Directional already engaged but need for precise execution with 30' survey frequency in critical sections
Pad Construction & Earthwork
Large earthwork quantities (145,100 cu yds) with specific compaction requirements; must contact NDIC Inspector Robert Stafford before starting
Cementing & Casing Services
Non-standard wet shoe design with backup hydraulic toe sleeve; double CBL requirements at intermediate and production casing points
Waste Management & Logistics
Closed mud system with cuttings going to specific facility (Smoky Butte Environmental); filter sock container management required from spud through flowback