| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe design with ability to frac out the toe for south setback compliance ๐ Stipulations section, Wellbore diagram notes Non-standard completion design using wet shoe sub with hydraulic toe sleeve backup to meet 150' south boundary setback requirements |
Unknown | Completions / Frac |
| Tier 3 |
Multi-well pad with off-spacing wells requiring surface use agreement affidavit and anti-collision mitigation plan ๐ Affidavit of Surface Damage Agreement, Anti-Collision Letter Operator is drilling 6 wells from a pad located outside target spacing units, requiring special regulatory compliance and anti-collision measures with existing dry well A. CVANCARA 9-7H |
2026-04-03 | Directional Drilling |
| Tier 3 |
Mandatory CBL on both 9-5/8" intermediate and 7" production casing ๐ Stipulations section Double cement bond log requirement beyond standard regulatory minimums |
Unknown | General Oilfield Services |
| Tier 3 |
Mandatory pre-construction contact with NDIC Field Inspector Robert Staffordโฐ TIME-SENSITIVE ๐ Stipulations section Specific inspector named with direct contact requirement before location construction begins |
Relative | General Oilfield Services |
| Tier 3 |
Closed mud system with cuttings disposal to specific licensed facility ๐ Stipulations, Disposal of Drill Cuttings section Explicit requirement for closed loop system and named disposal facility (Smoky Butte Environmental LLC) |
Unknown | Mud / Fluids |