๐Ÿ“Š Signals (8)

Tier Signal Date Service Impact
Tier 2 South setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe
๐Ÿ“„ Page 1, Stipulations section
Unusual setback justification tied to specific completion design (wet shoe with frac-out capability) rather than standard regulatory setbacks
Relative Completions / Frac
Tier 3 Operator has evaluated anti-collision with existing dry well A. CVANCARA 9-7H and plans 30' surveys in build/drop/curve sectionsโฐ TIME-SENSITIVE
๐Ÿ“„ Anti-collision letter to NDIC
Proactive anti-collision measures with specific survey frequency in high-risk sections
2026-04-13 Directional Drilling
Tier 3 Operator notified Continental Resources, Inc. of directional plans as required by NDIC Orders 31848 & 31973
๐Ÿ“„ Affidavit of notification
Formal notification to adjacent operator with detailed drilling plans due to off-spacing unit entry
2026-04-13 Directional Drilling
Tier 3 Closed mud system with no cuttings pit required
๐Ÿ“„ Page 1, Stipulations section
Mandates specific drilling waste management system different from conventional pits
Relative Mud / Fluids
Tier 3 CBL required on 9-5/8" intermediate casing prior to setting 7" casing
๐Ÿ“„ Page 1, Stipulations section
Extra cement bond log requirement between intermediate casing strings, not standard for all wells
Relative General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Robert Stafford prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Page 1, Stipulations section
Mandatory pre-construction contact requirement creates a regulatory gate that must be cleared before any dirt work can begin
Relative General Oilfield Services
Tier 3 Conductor, rat, or mouse holes must be constructed with casing and cemented to ground level
๐Ÿ“„ Page 2, Stipulations section
Enhanced conductor hole requirements for groundwater protection
Relative General Oilfield Services
Tier 3 Perimeter berm required surrounding entire location
๐Ÿ“„ Page 2, Stipulations section
Full perimeter containment requirement exceeds typical pad design
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling & MWD services
Enhanced survey requirements (30' in build/drop/curve) and anti-collision measures create immediate need for high-frequency surveying capabilities
Specialized cementing services
Multiple cementing requirements including CBL between casing strings, wet shoe installation, and auxiliary hole cementing create sequential service opportunities
Closed-loop drilling waste management
Mandated closed mud system with no cuttings pit requires immediate waste handling and transportation to pre-selected disposal facility
Pad construction & earthwork
Perimeter berm requirement and specific earthwork specifications (95% compaction, 3:1 slopes) create specialized construction timeline before drilling can commence