โ† Back to Daily Permits

๐Ÿ›ข๏ธ AJ 30-31-6-7 5H

Phoenix Operating LLC ยท Divide County, ND ยท File #43016 ยท Generated 2026-08-22 02:19

API
3302301827
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 South setback approval based on production liner cemented in lateral with wet shoe and ability to frac out the shoe
๐Ÿ“„ Stipulations section
Non-standard setback justification relying on specific completion technique (wet shoe with frac-out capability)
Unknown Completions / Frac
Tier 3 Specific anti-collision mitigation plan for proximity to existing dry well A. CVANCARA 9-7H, including 30' survey frequency in build/drop/curve sections
๐Ÿ“„ Letter to Todd Holweger re: Anti-Collision
Explicit anti-collision protocol beyond standard requirements due to nearby existing well, indicating directional drilling complexity
2026-04-13 Directional Drilling
Tier 3 Well is part of a 6-well pad drilled from off-spacing surface location, requiring surface use agreement affidavit and notification to adjacent operator (Continental Resources)
๐Ÿ“„ Affidavit of Surface Damage Agreement, Letter to Todd Holweger
Reveals multi-well pad development strategy with off-spacing surface location, requiring regulatory compliance for surface use and anti-collision coordination with competitor
2026-04-13 Directional Drilling
Tier 3 Well must be drilled in conjunction with another well meeting 1220' setback from east/west boundaries to justify spacing unit
๐Ÿ“„ Page 2 stipulations
Drilling approval conditional on companion well with specific positioning, indicating coordinated multi-well development
Relative General Oilfield Services
Tier 3 Requirement to contact NDIC Field Inspector Robert Stafford prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section
Specific inspector pre-notification requirement beyond standard procedures
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
High-precision requirements due to anti-collision concerns with existing well; 30' survey frequency specified in build/drop/curve sections
Waste Management/Disposal
Pre-selected disposal facility (Smoky Butte Environmental) indicates need for cuttings hauling and disposal services; closed mud system specified
Cementing & Completions
Wet shoe completion technique required for regulatory approval; specific cementing program detailed with multiple cement types
Pad Construction & Earthwork
Large earthwork quantities (133,050 cu yds cut); detailed pad layout with specific compaction requirements; pre-construction notification required