| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
South setback approval based on production liner cemented in lateral with wet shoe and ability to frac out the shoe ๐ Stipulations section Non-standard setback justification relying on specific completion technique (wet shoe with frac-out capability) |
Unknown | Completions / Frac |
| Tier 3 |
Specific anti-collision mitigation plan for proximity to existing dry well A. CVANCARA 9-7H, including 30' survey frequency in build/drop/curve sections ๐ Letter to Todd Holweger re: Anti-Collision Explicit anti-collision protocol beyond standard requirements due to nearby existing well, indicating directional drilling complexity |
2026-04-13 | Directional Drilling |
| Tier 3 |
Well is part of a 6-well pad drilled from off-spacing surface location, requiring surface use agreement affidavit and notification to adjacent operator (Continental Resources) ๐ Affidavit of Surface Damage Agreement, Letter to Todd Holweger Reveals multi-well pad development strategy with off-spacing surface location, requiring regulatory compliance for surface use and anti-collision coordination with competitor |
2026-04-13 | Directional Drilling |
| Tier 3 |
Well must be drilled in conjunction with another well meeting 1220' setback from east/west boundaries to justify spacing unit ๐ Page 2 stipulations Drilling approval conditional on companion well with specific positioning, indicating coordinated multi-well development |
Relative | General Oilfield Services |
| Tier 3 |
Requirement to contact NDIC Field Inspector Robert Stafford prior to location constructionโฐ TIME-SENSITIVE ๐ Stipulations section Specific inspector pre-notification requirement beyond standard procedures |
Relative | General Oilfield Services |