๐Ÿ›ข๏ธ Burke 414-3416H

EOG RESOURCES, INC. ยท Mountrail County, ND ยท File #43017 ยท Generated 2026-08-22 02:20

API
3306105698
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Approval conditional on 500' east and 150' west setbacks within 3200-acre spacing unit, with west setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe.
๐Ÿ“„ Stipulations section, page 1
Specific, non-standard setback requirement tied to a unique completion design (cemented liner with wet shoe) that dictates frac strategy and wellbore placement constraints.
Unknown Completions / Frac
Tier 2 Operator requests permission to frac out the toe (wet shoe).
๐Ÿ“„ Completion & Perforation / Cementing Program notes, page near end
Explicitly declared intent to use a 'frac out' completion technique on a well with a cemented liner and wet shoe, which is a specific operational method.
Unknown Completions / Frac
Tier 3 Affidavit states EOG does not use diesel fuel in hydraulic fracturing for this and three other wells (Burke 413-3421H, 415-3411H, 416-3512H), sworn on September 26, 2025.
๐Ÿ“„ Affidavit section near end
Formal, time-stated regulatory compliance filing for a multi-well pad, explicitly ruling out diesel-based frac fluids.
2025-09-26 Completions / Frac
Tier 3 EOG must contact NDIC Field Inspector Dylan Roach (701-770-1981) prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section, page 1
Explicit, named regulatory point of contact required before pad construction begins, indicating a mandatory pre-construction checkpoint.
Relative Drilling Rigs
Tier 3 Pad design includes a 28,000 sq ft, 4' deep 'moat' designed to hold 19,950 barrels of water, with production pad elevation designed 2.0' higher than well pad.
๐Ÿ“„ Pad Layout details, page near end
Non-standard, large-scale containment infrastructure ('moat') with specific volume capacity, indicating planned significant fluid handling or emergency containment.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil Construction & Earthwork
Pad design finalized (revisions Nov 2025), with major excavation (28,295 CY) and embankment (36,110 CY) volumes specified. Construction cannot start until EOG contacts NDIC Inspector Dylan Roach, creating a near-term gate.
Cementing
Halliburton products explicitly specified in detailed cementing program. The unique 'cemented liner with wet shoe' design is critical to well approval and dictates specific slurry designs (e.g., silica flour in liner).
Hydraulic Fracturing & Stimulation
Design locked into 'frac out the shoe' technique. Affidavit (Sep 2025) rules out diesel fuels, constraining fluid chemistry. Multi-well pad (7 wells) indicates large, sequential frac campaign opportunity.
Water Management
Large containment 'moat' (19,950 bbl capacity) designed, indicating planned high-volume water handling for completions. Requires frac tank, pumping, and filtration services aligned with strict filter sock disposal rules.