๐Ÿ›ข๏ธ Burke 413-3421H

EOG RESOURCES, INC. ยท Mountrail County, ND ยท File #43018 ยท Generated 2026-08-22 02:20

API
3306105699
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Approval conditional on 500' east and 150' west setbacks within 2560-acre spacing unit, with west setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe.
๐Ÿ“„ Stipulations section, first condition
Unusually tight west setback (150') justified by specific liner cementing and frac-out plan, indicating a tailored engineering solution to maximize lateral length within unit boundaries.
Unknown Completions / Frac
Tier 2 Operator requests permission to frac out the toe (wet shoe) as part of completion design.
๐Ÿ“„ Cementing program notes, production liner section
Explicitly planned frac-out of the cemented shoe is a non-standard completion technique to initiate fractures, indicating a specific stimulation design intent.
Unknown Completions / Frac
Tier 3 Affidavit dated September 26, 2025, affirms no diesel fuel will be used in hydraulic fracturing for this and three other Burke wells.
๐Ÿ“„ Affidavit section, signed and notarized
Formal, time-stamped legal affidavit covering a four-well pad, demonstrating proactive regulatory compliance and locking in fluid chemistry constraints well ahead of operations.
2025-09-26 Completions / Frac
Tier 3 Production pad is designed 2.0 feet higher than well pad, with compaction testing required.
๐Ÿ“„ Pad layout notes, multiple instances
Intentional elevation differential for drainage/separation and explicit compaction testing requirement indicates rigorous pad construction specifications.
Unknown Drilling Rigs
Tier 3 EOG must contact NDIC Field Inspector Dylan Roach prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section, specific contact requirement
Mandatory pre-construction contact with a named inspector (Dylan Roach) indicates heightened regulatory oversight or site-specific sensitivities.
Relative General Oilfield Services
Tier 3 Pad design includes a 28,000 sq ft, 4' deep containment moat capable of holding 19,950 barrels of water.
๐Ÿ“„ Pad layout notes, wetland avoidance section
Massive, engineered containment feature exceeds typical berms, indicating planned large-volume water handling or emergency containment for multi-well pad operations.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil Construction & Earthwork
Pad design is finalized (plats revised Nov 2025); 28,295 CY of excavation and 36,110 CY of fill specified with compaction testing required. Construction is imminent post-permit approval (06/10/2026).
Directional Drilling & MWD
Detailed directional plan with specific survey program (Superior MWD+IFR1 tool named). Drilling anticipated to start 'Upon Approval' with 60-90 day duration. Anti-collision review acknowledged.
Cementing & Stimulation
Cementing program is highly detailed with Halliburton products. Unique 'frac out the shoe' completion requires integrated cementing and stimulation planning. Affidavit locks fluid constraints.
Water & Containment Management
Large containment moat (19,950 bbl capacity) indicates major water handling needs for completion and flowback. Must be operational before high-volume operations.