| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Production liner cemented in lateral with wet shoe and no ability to frac out the shoe ๐ Stipulations section and Wellbore Schematic note Non-standard completion design limits stimulation options at shoe, affecting frac design and requiring precise stage planning |
Unknown | Completions / Frac |
| Tier 3 |
Wellbore enters Bakken Petroleum System outside target spacing unit, requiring waiver of Order 31973 drillback notification ๐ Waiver letter to Drillback 31973 Indicates complex pad development with wellbores traversing adjacent units, requiring regulatory waiver and showing operator's multi-unit development strategy |
2026-05-29 | Completions / Frac |
| Tier 3 |
Closed mud system with no cuttings pit, cuttings hauled to state-approved disposal facility ๐ Stipulations and Proposed Work sections Environmental control requirement exceeds basic standards, indicating sensitive location or operator protocol |
Unknown | Mud / Fluids |
| Tier 3 |
Mandatory contact with NDIC Field Inspector Nicole Ewoniuk prior to location constructionโฐ TIME-SENSITIVE ๐ Stipulations section Personalized regulatory oversight requirement suggests site-specific environmental or geological concerns |
Relative | General Oilfield Services |
| Tier 3 |
Operator asserts no diesel-based compounds will be used in hydraulic stimulation ๐ Proposed Work section Voluntary restriction beyond regulatory requirements, indicates specific fluid chemistry preferences |
Unknown | Completions / Frac |
| Tier 3 |
Pad includes future SWD well in addition to three Bakken horizontals ๐ Proposed Work section Integrated disposal planning shows long-term pad strategy and water management approach |
Unknown | General Oilfield Services |