| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Production liner cemented in lateral with wet shoe and no ability to frac out the shoe ๐ Conditions of Approval, Stipulations Non-standard completion design that limits stimulation options and requires specialized cementing approach |
Unknown | Completions / Frac |
| Tier 3 |
Surface Damage Affidavit executed for drilling from pad in Section 33 into adjacent spacing unit in Sections 6 & 7 ๐ Surface Damage Affidavit Documents surface use agreement for cross-boundary drilling, indicating complex land and access planning |
2026-05-29 | General Oilfield Services |
| Tier 3 |
Wellbore enters Bakken Petroleum System outside target spacing unit, requiring waiver of NDIC Order 31973 affidavit ๐ Waiver letter to Drillback 31973 Indicates complex pad development strategy with wellbores crossing spacing unit boundaries, requiring regulatory coordination and potential neighbor operator notifications |
Unknown | Regulatory / Permitting |
| Tier 3 |
Impermeable liner may be required at discretion of NDIC Field Inspector due to QGIS sensitive geology layer ๐ Conditions of Approval Contingency based on sensitive geology that could require additional environmental protection measures |
Relative | General Oilfield Services |
| Tier 3 |
Mandatory contact with NDIC Field Inspector Nicole Ewoniuk prior to location constructionโฐ TIME-SENSITIVE ๐ Conditions of Approval Specific inspector assignment with direct contact requirement creates regulatory gate before pad construction |
Relative | General Oilfield Services |