๐Ÿ›ข๏ธ Kinzel 1-6H

Murfin Drilling Company, Inc. ยท Dunn County, ND ยท File #43020 ยท Generated 2026-08-22 02:21

API
3302505205
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Production liner cemented in lateral with wet shoe and no ability to frac out the shoe
๐Ÿ“„ Conditions of Approval, Stipulations
Non-standard completion design that limits stimulation options and requires specialized cementing approach
Unknown Completions / Frac
Tier 3 Surface Damage Affidavit executed for drilling from pad in Section 33 into adjacent spacing unit in Sections 6 & 7
๐Ÿ“„ Surface Damage Affidavit
Documents surface use agreement for cross-boundary drilling, indicating complex land and access planning
2026-05-29 General Oilfield Services
Tier 3 Wellbore enters Bakken Petroleum System outside target spacing unit, requiring waiver of NDIC Order 31973 affidavit
๐Ÿ“„ Waiver letter to Drillback 31973
Indicates complex pad development strategy with wellbores crossing spacing unit boundaries, requiring regulatory coordination and potential neighbor operator notifications
Unknown Regulatory / Permitting
Tier 3 Impermeable liner may be required at discretion of NDIC Field Inspector due to QGIS sensitive geology layer
๐Ÿ“„ Conditions of Approval
Contingency based on sensitive geology that could require additional environmental protection measures
Relative General Oilfield Services
Tier 3 Mandatory contact with NDIC Field Inspector Nicole Ewoniuk prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Conditions of Approval
Specific inspector assignment with direct contact requirement creates regulatory gate before pad construction
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Regulatory Coordination & Inspection Services
Mandatory contact with specific NDIC inspector (Nicole Ewoniuk) required before construction, creating immediate need for regulatory liaison services
Specialized Cementing Services
Production liner cemented in lateral with wet shoe design requires specialized cementing expertise and equipment for non-standard application
Pad Construction & Earthwork
Detailed construction plans with 7.5+ acre disturbance, 14,557 CY cut, 22,742 CY fill quantities, and specific berm/ditch requirements indicate imminent earthwork contract opportunity
Directional Drilling & Survey Services
Complex well trajectory crossing section boundaries with anti-collision requirements creates need for precise directional drilling and survey services