๐Ÿ›ข๏ธ ALBERT SOUTH 34-33-32 2H

DEVON ENERGY WILLISTON, L.L.C ยท McKenzie County, ND ยท File #43021 ยท Generated 2026-08-22 02:21

API
3305310828
Target Formation
Bakken-Three Forks (Foreman Butte-Bakken Pool)
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Anti-collision report (dated 6/3/2026) shows Level 1 (closest) proximity warnings with 'SAFELY TRUST 28-33 1-H' and 'TJELDE 29-32 1-H' wells.โฐ TIME-SENSITIVE
๐Ÿ“„ Anticollision Summary Report
Recent engineering analysis confirms close proximity to existing wells, requiring precise directional drilling to avoid collisions.
2026-06-03 Directional Drilling
Tier 3 Well is part of a 4-well pad (Albert South 1H-4H) drilled from a surface location in Section 34, but all wells are 'off-spacing' from their target units, requiring a surface use agreement affidavit.
๐Ÿ“„ AFFIDAVIT OF SURFACE DAMAGE AGREEMENT, Stipulations (500' setback condition referencing 1600-acre spacing unit)
Indicates a pad development strategy that consolidates surface location despite subsurface spacing unit misalignment, requiring specific landowner agreements.
2025-12-15 General Oilfield Services
Tier 3 Lateral design includes a 'wet shoe' in the production liner with the 'ability to frac out the shoe', noted as the basis for a reduced west boundary setback (150' vs standard 500').
๐Ÿ“„ Stipulations section, Casing Details schematic note
Specific completion design feature (wet shoe) directly influences regulatory spacing approval. Indicates planned frac strategy that includes shoe stimulation.
Unknown Completions / Frac
Tier 3 Operator requested and obtained a waiver of the 3-day waiting period to commence operations, citing a contractual obligation with a civil construction company to start on or around 5/1/2026.โฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit to Waive Waiting Period
Reveals urgency and pre-committed construction start date, indicating accelerated timeline and potential for early mobilization of services.
Relative Regulatory / Permitting
Tier 3 Explicit directive to contact NDIC Field Inspector Will Ryan (701-770-6684) prior to location construction.
๐Ÿ“„ Stipulations section
Regulatory pre-construction checkpoint with a named inspector. Non-routine personal directive indicates specific oversight or site-specific conditions.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil Construction & Pad Building
Contractual start date targeted for on or around 5/1/2026 (past relative to permit date, but shows planned sequence). Immediate need post-permit approval to meet accelerated schedule.
Directional Drilling & Surveying
Anti-collision report (6/3/2026) shows Level 1 proximity risks. High-precision drilling required immediately upon spud to navigate crowded wellbore environment.
Completion & Stimulation
Non-standard 'wet shoe' design with ability to 'frac out the shoe' and a backup hydraulic toe sleeve indicates specialized completion planning needed post-drilling.
Waste Management
Pre-selected vendor (IHD Solids Management) for cuttings disposal. Services required as soon as drilling begins with closed-loop system.
Regulatory & Inspection Coordination
Mandatory contact with specific NDIC Field Inspector (Will Ryan) prior to construction. This is a immediate pre-construction gate.