๐Ÿ›ข๏ธ HA-State- 152-95-1621H-11U

HESS BAKKEN INVESTMENTS II, LLC ยท McKenzie County, ND ยท File #43022 ยท Generated 2026-08-22 02:22

API
3305310829
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Production liner to be cemented with a 'wet shoe' and ability to 'frac out the shoe', intentionally over-displacing cement by 2 bbls.
๐Ÿ“„ Drilling Prognosis section, Completion Equipment details
Specifies a precise, non-standard cementing procedure for the liner shoe to facilitate direct fracture initiation from the shoe, indicating a tailored completion design for the tight boundary setback.
Unknown Completions / Frac
Tier 3 U-turn horizontal well design with lateral closer than 500 feet to spacing unit boundary, requiring pre-approval of fracture stimulation procedures and as-built survey submission.
๐Ÿ“„ Page 2 of 11, Conditions of Approval
Indicates a complex wellbore trajectory (U-turn) navigating tight spacing unit boundaries, triggering heightened regulatory scrutiny and requiring specialized completion engineering approval before operations.
2026-06-11 Directional Drilling
Tier 3 Anti-collision plan reveals planned wellbore passes with separation factors as low as 1.6-1.8 against existing wells on the same pad (AN-MELBY-152-95-1030H-1, HA-STATE-152-95-1621H-10).
๐Ÿ“„ Anticollision Report, Summary table
Demonstrates extremely tight wellbore spacing and active anti-collision management on a multi-well pad, requiring real-time monitoring and precise geosteering.
2026-05-15 Directional Drilling
Tier 3 Affidavit confirms Surface Use Agreement obtained for 'off lease' drilling into specified adjacent sections, effective July 1, 2025.
๐Ÿ“„ AFFIDAVIT by Jennings White
Reveals pre-meditated, long-lead land work to secure surface access for extended-reach drilling into non-surface-owned units, de-risking the pad development.
2025-07-01 General Oilfield Services
Tier 3 Permit includes explicit requirement for a closed mud system with no cuttings pit.
๐Ÿ“„ Page 1 of 11, Stipulations
Non-standard waste management mandate that eliminates a conventional disposal option, requiring alternative cuttings handling and hauling plans.
Unknown Mud / Fluids
Tier 3 Waiver requested for standard open hole logs (Acoustic/Sonic, Density/Porosity, etc.), relying on cased hole evaluation.
๐Ÿ“„ Page 4 of 11, PROPOSED LOGS
Deviates from routine data acquisition program, indicating operator confidence in offset data or a cost-saving design choice that reduces open-hole logging services.
Unknown Regulatory / Permitting
Tier 3 Operator must contact specific NDIC Field Inspector (Tayden Jacobson) prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 1 of 11, Stipulations
Identifies a named regulatory point-of-contact and a mandatory pre-construction checkpoint, indicating potential site-specific sensitivities or inspector oversight.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / MWD / Geosteering
Critical for executing U-turn well path with tight anti-collision tolerances (separation factors ~1.6-1.8). Real-time survey and geosteering required per plan.
Cementing (Specialized)
Specific wet shoe procedure required for production liner to enable 'frac out the shoe'. Centralizer placement program is detailed and non-routine.
Cuttings Handling / Waste Management
Closed mud system with no cuttings pit mandated, creating immediate need for hauling to approved facility and closed-loop system services.
Civil Construction & Pad Building
Engineered pad design by KLJ requires construction per specific plans (berms, ditches, surfacing). Must be coordinated with NDIC inspector pre-construction.
Regulatory & Permitting Support
U-turn well requires pre-approval of fracture procedures and as-built survey submission. Ongoing interface with named NDIC inspector (Tayden Jacobson).