| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Production liner to be cemented with a 'wet shoe' and ability to 'frac out the shoe', intentionally over-displacing cement by 2 bbls. ๐ Drilling Prognosis section, Completion Equipment details Specifies a precise, non-standard cementing procedure for the liner shoe to facilitate direct fracture initiation from the shoe, indicating a tailored completion design for the tight boundary setback. |
Unknown | Completions / Frac |
| Tier 3 |
U-turn horizontal well design with lateral closer than 500 feet to spacing unit boundary, requiring pre-approval of fracture stimulation procedures and as-built survey submission. ๐ Page 2 of 11, Conditions of Approval Indicates a complex wellbore trajectory (U-turn) navigating tight spacing unit boundaries, triggering heightened regulatory scrutiny and requiring specialized completion engineering approval before operations. |
2026-06-11 | Directional Drilling |
| Tier 3 |
Anti-collision plan reveals planned wellbore passes with separation factors as low as 1.6-1.8 against existing wells on the same pad (AN-MELBY-152-95-1030H-1, HA-STATE-152-95-1621H-10). ๐ Anticollision Report, Summary table Demonstrates extremely tight wellbore spacing and active anti-collision management on a multi-well pad, requiring real-time monitoring and precise geosteering. |
2026-05-15 | Directional Drilling |
| Tier 3 |
Affidavit confirms Surface Use Agreement obtained for 'off lease' drilling into specified adjacent sections, effective July 1, 2025. ๐ AFFIDAVIT by Jennings White Reveals pre-meditated, long-lead land work to secure surface access for extended-reach drilling into non-surface-owned units, de-risking the pad development. |
2025-07-01 | General Oilfield Services |
| Tier 3 |
Permit includes explicit requirement for a closed mud system with no cuttings pit. ๐ Page 1 of 11, Stipulations Non-standard waste management mandate that eliminates a conventional disposal option, requiring alternative cuttings handling and hauling plans. |
Unknown | Mud / Fluids |
| Tier 3 |
Waiver requested for standard open hole logs (Acoustic/Sonic, Density/Porosity, etc.), relying on cased hole evaluation. ๐ Page 4 of 11, PROPOSED LOGS Deviates from routine data acquisition program, indicating operator confidence in offset data or a cost-saving design choice that reduces open-hole logging services. |
Unknown | Regulatory / Permitting |
| Tier 3 |
Operator must contact specific NDIC Field Inspector (Tayden Jacobson) prior to location construction.โฐ TIME-SENSITIVE ๐ Page 1 of 11, Stipulations Identifies a named regulatory point-of-contact and a mandatory pre-construction checkpoint, indicating potential site-specific sensitivities or inspector oversight. |
Relative | General Oilfield Services |