| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
North setback approval based on production liner cemented in lateral with wet shoe and ability to frac out the shoe ๐ Page 1 of 10, Stipulations Unusual regulatory condition tying approval to specific completion technique (wet shoe with frac-out capability) |
Relative | Completions / Frac |
| Tier 3 |
Operator notified adjacent spacing unit operator (Oasis) per NDIC Order 31848 with directional plans and contact information ๐ Affidavit section at end of document Formal inter-operator notification required due to wellbore traversing adjacent spacing unit; reveals competitive awareness |
2026-06-09 | Directional Drilling |
| Tier 3 |
Operator must contact NDIC Field Inspector Jason Hicks prior to location constructionโฐ TIME-SENSITIVE ๐ Page 1 of 10, Stipulations Specific inspector named with direct contact requirement; creates regulatory checkpoint before construction can begin |
Relative | General Oilfield Services |
| Tier 3 |
Well requires drilling in conjunction with another well to meet 1220' east/west setback for spacing unit justification ๐ Page 2 of 10, Conditions of Approval Creates interdependency between wells; operator must coordinate drilling of multiple wells to satisfy regulatory spacing requirements |
Relative | General Oilfield Services |
| Tier 3 |
First perforation point approximately 100' from hard line and 250' from section line ๐ Drilling plan diagram annotations Specific geometric constraints on completion design tied to property boundaries |
Unknown | General Oilfield Services |