| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
North setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe ๐ Page 2 of 10, Conditions of Approval Unusual setback justification tied to specific completion technique (wet shoe with frac-out capability) |
Unknown | Completions / Frac |
| Tier 3 |
Operator must provide directional drilling and completion plans to Oasis for adjacent spacing unit per NDIC Order 31848 ๐ Affidavit section (Colorado notarized document) Legal affidavit notarized in Colorado shows formal regulatory compliance with competitor notification requirement |
2026-06-09 | Directional Drilling |
| Tier 3 |
Closed mud system with no cuttings pit required - cuttings to be hauled to Smoky Butte Environmental LLC ๐ Page 2 of 10 (Stipulations) and Page 5 of 10 (Disposal of Drill Cuttings) Specific disposal vendor pre-selected (Smoky Butte Environmental LLC) with explicit address; closed-loop system mandate |
Unknown | Mud / Fluids |
| Tier 3 |
Operator required to notify NDIC Field Inspector Jason Hicks prior to location constructionโฐ TIME-SENSITIVE ๐ Page 2 of 10, Stipulations section Specific field inspector named with direct contact requirement creates a regulatory gate that must be cleared before construction can begin |
Unknown | General Oilfield Services |
| Tier 3 |
Waiver requested for Acoustic/Sonic, Cased Hole, Casing Evaluation, Cement Evaluation, Density/Porosity logs ๐ Page 4 of 10, Proposed Logs section Multiple standard evaluation logs waived, indicating alternative formation evaluation strategy |
Unknown | Regulatory / Permitting |
| Tier 3 |
Perimeter berm required surrounding entire location; dikes and base material must be sufficiently impermeable ๐ Page 2 of 10 and Page 9 of 10 Specific containment requirements beyond standard; impermeable material specification |
Unknown | General Oilfield Services |