๐Ÿ›ข๏ธ WILLA 6-31-30-19 2H

Phoenix Operating LLC ยท Burke County, ND ยท File #43024 ยท Generated 2026-08-22 02:23

API
3301302038
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 North setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe
๐Ÿ“„ Page 2 of 10, Conditions of Approval
Unusual setback justification tied to specific completion technique (wet shoe with frac-out capability)
Unknown Completions / Frac
Tier 3 Operator must provide directional drilling and completion plans to Oasis for adjacent spacing unit per NDIC Order 31848
๐Ÿ“„ Affidavit section (Colorado notarized document)
Legal affidavit notarized in Colorado shows formal regulatory compliance with competitor notification requirement
2026-06-09 Directional Drilling
Tier 3 Closed mud system with no cuttings pit required - cuttings to be hauled to Smoky Butte Environmental LLC
๐Ÿ“„ Page 2 of 10 (Stipulations) and Page 5 of 10 (Disposal of Drill Cuttings)
Specific disposal vendor pre-selected (Smoky Butte Environmental LLC) with explicit address; closed-loop system mandate
Unknown Mud / Fluids
Tier 3 Operator required to notify NDIC Field Inspector Jason Hicks prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Page 2 of 10, Stipulations section
Specific field inspector named with direct contact requirement creates a regulatory gate that must be cleared before construction can begin
Unknown General Oilfield Services
Tier 3 Waiver requested for Acoustic/Sonic, Cased Hole, Casing Evaluation, Cement Evaluation, Density/Porosity logs
๐Ÿ“„ Page 4 of 10, Proposed Logs section
Multiple standard evaluation logs waived, indicating alternative formation evaluation strategy
Unknown Regulatory / Permitting
Tier 3 Perimeter berm required surrounding entire location; dikes and base material must be sufficiently impermeable
๐Ÿ“„ Page 2 of 10 and Page 9 of 10
Specific containment requirements beyond standard; impermeable material specification
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil Construction & Pad Building
Must contact NDIC Field Inspector Jason Hicks before construction; perimeter berm and impermeable material specifications require specialized expertise
Directional Drilling & Surveying
Complex multi-well pad with anti-collision concerns; 4D Surveying already engaged but may need additional survey support during drilling
Waste Management & Disposal
Closed-loop system with cuttings going to Smoky Butte Environmental; filter sock container required from spud through flowback
Completion & Stimulation
Wet shoe design with frac-out capability specified; first perf point approximately 100' from hard line indicates precise placement requirements