| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditional on specific lateral setback design using production liner with wet shoe and ability to frac out shoe for north boundary setback ๐ Stipulations section, NDIC Field Order Info Unusual regulatory condition requiring specific completion design (wet shoe with frac-out capability) to meet setback requirements rather than standard geometric setback |
Unknown | Completions / Frac |
| Tier 2 |
Wet shoe with ability to frac out toe specified as completion method, with hydraulic toe sleeve as backup ๐ Completion & Perforation section, annotations Specific completion technique mandated in permit; includes backup system indicating operational risk mitigation |
Unknown | Completions / Frac |
| Tier 3 |
Operator required to notify Oasis of directional plans for wells entering adjacent spacing unit per Order 31848 ๐ Affidavit section Regulatory requirement for cross-unit coordination with specific competitor (Oasis); creates operational interdependency |
2026-06-09 | Directional Drilling |
| Tier 3 |
Closed mud system with no cuttings pit specified in permit conditions ๐ Stipulations section, Conditions of Approval Explicit prohibition of cuttings pit requires alternative waste handling; differs from standard open pit operations |
Unknown | Mud / Fluids |
| Tier 3 |
Mandatory pre-construction contact with specific NDIC Field Inspector Jason Hicks (701-720-3523)โฐ TIME-SENSITIVE ๐ Stipulations section, Conditions of Approval Direct inspector contact requirement rather than generic notification; creates specific regulatory gate before construction |
Relative | General Oilfield Services |
| Tier 3 |
Drill cuttings disposal pre-selected to Smoky Butte Environmental LLC at specific Fortuna, ND address ๐ Disposal of Drill Cuttings section Vendor explicitly named in permit rather than generic disposal requirement; indicates pre-contracted relationship |
Unknown | General Oilfield Services |