| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
North setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe ๐ Page 2 of 10, Stipulations section Unusual setback justification tied to specific completion design (wet shoe with frac-out capability) rather than standard spacing rules |
Unknown | Completions / Frac |
| Tier 3 |
Operator notified Oasis of directional plans per NDIC Order 31848 due to wellbores entering adjacent spacing unit ๐ Affidavit section at end of document Formal notification to competitor (Oasis) about trajectory through their unit, indicating potential unit boundary issues or coordination requirements |
2026-06-09 | Directional Drilling |
| Tier 3 |
Cores and samples must be submitted within 30 days of drilling completion (samples) and 180 days (cores)โฐ TIME-SENSITIVE ๐ Cores and Samples letter, Page 1 Specific regulatory deadlines with civil penalties up to $12,500 per day for violations |
Relative | General Oilfield Services |
| Tier 3 |
Operator must contact NDIC Field Inspector Jason Hicks prior to location construction ๐ Page 2 of 10, Stipulations section Specific inspector named with direct contact requirement creates a regulatory gate that must be cleared before pad construction can begin |
Unknown | General Oilfield Services |
| Tier 3 |
Well must be drilled in conjunction with a well that meets 1220' setback from east and west spacing unit boundaries ๐ Page 3 of 10 Drilling approval conditional on another well meeting specific setback requirements, creating interdependency |
Unknown | General Oilfield Services |