Enerplus Resources USA Corporation ยท Williams County, ND ยท File #43028 ยท Generated 2026-08-22 02:24

API
3310506838
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration specified for production liner to enable wireline toe initiation, avoiding more expensive tubing/tractor methods
๐Ÿ“„ Section 1.11 Wet Shoe, Fig. 1.1
Non-standard cementing/completion technique reveals operator's cost-saving intent and specific completion sequence.
Unknown Completions / Frac
Tier 3 Closed mud system with no cuttings pit required
๐Ÿ“„ Page 3 of 11, Stipulations
Mandates specific waste handling infrastructure, eliminating open pit option.
2026-06-12 Mud / Fluids
Tier 3 U-turn horizontal well requiring prior approval of fracture stimulation procedures due to wellbore closer than 500 feet to parallel spacing unit boundary
๐Ÿ“„ Page 2 of 11, Stipulations section
Indicates complex well path design with regulatory hurdles; requires specific frac design approval before completion, creating a gating item for completion services.
2026-06-12 Completions / Frac
Tier 3 Anticipated drilling commencement date of June 7, 2025, but permit documents dated 2026โฐ TIME-SENSITIVE
๐Ÿ“„ Section 1.8 Anticipated Starting Dates
Date discrepancy suggests permit renewal or re-filing; well likely delayed from original plan, indicating persistent intent.
2025-06-07 Drilling Rigs
Tier 3 Waiver requested for open hole logs; only Cement Bond Log planned in cased hole
๐Ÿ“„ Section 1.7 Evaluation Program
Operator opting out of standard open hole logging reduces evaluation scope, relying on cased hole evaluation only.
Unknown Regulatory / Permitting
Tier 3 Specific anti-collision procedures include using gamma ray signatures to identify existing wellbores in target zone
๐Ÿ“„ Anti-Collision Statement
Reveals advanced real-time geosteering and collision avoidance tactics in dense well environment.
Unknown Directional Drilling
Tier 3 Operator must contact NDIC Field Inspector Marc Binns prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Page 3 of 11, Construction Commencement Notification
Specific inspector named creates a direct regulatory touchpoint; non-compliance could delay pad construction.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / MWD/LWD
Complex U-turn well with tight anti-collision requirements; real-time survey and geosteering critical for navigating dense existing wellbores.
Cementing Services
Wet shoe configuration requires precise cement over-displacement; liner cementing must achieve specific uncemented annulus length for toe initiation.
Wireline Perforating
Wet shoe design enables wireline toe initiation; first stage perforating will be via wireline rather than tubing-conveyed or tractor.
Drilling Waste Management
Closed mud system mandated; cuttings must be hauled to licensed disposal facilities from pre-approved list.
Fracture Stimulation Design
U-turn well requires prior NDIC approval of frac procedures; design must account for nearby boundary and fracture initiation points.