๐Ÿ›ข๏ธ DC GUNNER 1 SWD

Phoenix Operating LLC ยท Williams County, ND ยท File #43034 ยท Generated 2026-08-22 02:25

API
3310506839
Target Formation
Inyan Kara Formation (Dakota Group)
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 3 Permit expiration deadline: must be completed as SWD well by June 15, 2027โฐ TIME-SENSITIVE
๐Ÿ“„ Page 3 of 11, UIC Stipulations
Creates firm deadline for drilling, completion, and facility construction, indicating urgency in 2026-2027 timeframe.
2027-06-15 General Oilfield Services
Tier 3 Permit includes explicit tank diking variance approval contingent on post-construction as-built schematic submission
๐Ÿ“„ Page 3 of 11, UIC Stipulations
Regulatory variance granted upfront reduces uncertainty but imposes specific post-construction documentation requirement, creating a follow-up service opportunity.
2026-06-15 General Oilfield Services
Tier 3 SPCC Plan required within six months of commissioning, with annual training mandateโฐ TIME-SENSITIVE
๐Ÿ“„ UIC Plan Section 8: Spill Prevention and Monitoring Controls
Creates defined post-construction service window for SPCC development and implementation.
Relative General Oilfield Services
Tier 3 SWD facility co-located with oil production facilities within same berms, requiring integrated containment design
๐Ÿ“„ UIC Plan Section 7: Facilities Design
Unusual integration of SWD and production facilities increases complexity of containment design, spill prevention, and monitoring systems.
Unknown General Oilfield Services
Tier 3 Comprehensive SCADA monitoring system specified with multiple alarms (tank levels, separator levels, ESDV, tubing pressure, vibration)
๐Ÿ“„ UIC Plan Section 8: Spill Prevention and Monitoring Controls
Beyond basic regulatory requirements, indicates operator commitment to advanced real-time monitoring and automated shutdown systems.
Unknown General Oilfield Services
Tier 3 Operator plans to inject only from on-pad wells initially, explicitly rejecting third-party volumes
๐Ÿ“„ UIC Plan Section 6: Proposed Injection Program
Indicates dedicated infrastructure for pad-specific disposal rather than commercial service, limiting near-term water hauling but suggesting future expansion potential.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Automation & Control Systems
SCADA/PLC system specification indicates immediate need for design and installation to meet facility commissioning timeline.
Civil Construction & Earthwork
Road construction permit submitted and awaiting approval; pad construction must align with June 2027 completion deadline.
Environmental Compliance
SPCC Plan required within six months of commissioning; as-built schematic due 30 days after construction.
Directional Drilling Services
Anti-collision analysis complete; drilling must occur before permit expiration in June 2027.