๐Ÿ›ข๏ธ ALTBIER 1831-11BH

KODA RESOURCES OPERATING, LLC ยท Divide County, ND ยท File #43035 ยท Generated 2026-08-22 02:25

API
3302301829
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 South setback reduced to 150' (vs standard 500') based on production liner cemented in lateral with wet shoe and ability to frac out shoe.
๐Ÿ“„ Stipulations section
Non-standard setback approval indicates tailored engineering solution for pad optimization.
Unknown Completions / Frac
Tier 3 Operator requested waiver from three-day waiting period for construction/operations after APD approval, citing pad development efficiency.โฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit Request for Waiver to Three-Day Waiting Period
Indicates urgency to commence operations immediately upon permit approval, bypassing standard regulatory waiting period.
2026-04-06 Regulatory / Permitting
Tier 3 Wellbore enters Bakken Petroleum System outside target spacing unit (Sections 19,30,31), requiring directional plan submission to adjacent unit operator, but waiver granted as KODA operates both units.
๐Ÿ“„ Letter to Todd Holweger dated April 6, 2026
Demonstrates complex multi-unit development strategy and regulatory navigation for cross-boundary drilling.
2026-04-06 Directional Drilling
Tier 3 Anti-collision report shows Level 1 and Level 2 separation factors with offset wells on pad, requiring precise directional control.
๐Ÿ“„ KLX Anticollision Report
High-density pad drilling with close wellbore proximity demands advanced directional planning and real-time monitoring.
2026-03-31 Directional Drilling
Tier 3 Closed mud system with no cuttings pit; all drill cuttings to be disposed at 13 Mile Landfill, Williston, ND.
๐Ÿ“„ Stipulations and Drilling Fluids Program
Mandates specific waste handling protocol and pre-selected disposal facility.
Unknown Mud / Fluids
Tier 3 Operator will submit sundry to waive open hole logs, relying on MWD and cased hole evaluation only.
๐Ÿ“„ Drilling Plan - Evaluation Program
Deviates from standard logging program, reducing evaluation costs but increasing reliance on MWD and CBL/VDL.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & MWD
Anti-collision risks are elevated (Level 1/2 separations); KLX Directional already engaged but precision execution is critical for imminent drilling.
Cementing & Completion Services
Wet shoe design and liner cementing are critical for approved reduced setback; frac-out capability required.
Waste Hauling & Disposal
Closed-loop system mandated; cuttings disposal pre-specified to 13 Mile Landfill; immediate need upon spud.
Civil Construction & Earthwork
Pad expansion to accommodate 11th well; detailed earthwork quantities (88,940 Cu. Yds) and berm construction required prior to operations.