| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Permit expiration deadline: well must be completed as SWD by June 16, 2027, or permit expires.โฐ TIME-SENSITIVE ๐ Page 3 of 10, UIC stipulations Creates a hard deadline for drilling, completion, and facility construction, driving operator urgency and contractor scheduling. |
2027-06-16 | General Oilfield Services |
| Tier 3 |
Approach permit includes a temporary culvert (18x110) with installation date 3/26/2026 and removal date 3/26/2027.โฐ TIME-SENSITIVE ๐ Appendix F, Approach Permit Application Specific temporary infrastructure with a one-year lifespan, indicating planned construction activity window. |
2026-03-26 | General Oilfield Services |
| Tier 3 |
Requirement to submit detailed SWD facility schematic and construction dates within 30 days following construction completion.โฐ TIME-SENSITIVE ๐ Page 2 of 10, UIC stipulations Mandates specific post-construction documentation with a tight deadline, not a routine filing. |
Relative | General Oilfield Services |
| Tier 3 |
Pressure test on high-pressure injection pipeline (100 psi over permitted max) required prior to injection, with results reported on a Sundry Form. ๐ Page 2 of 10, UIC stipulations Specific, non-routine testing and reporting requirement for the pipeline, not just the well. |
Relative | General Oilfield Services |
| Tier 3 |
Tank diking variance approved contingent on submission of as-built schematic after facility construction. ๐ Page 3 of 10, UIC stipulations Regulatory allowance with a post-construction compliance requirement. Indicates non-standard tank containment design. |
Relative | General Oilfield Services |