๐Ÿ›ข๏ธ BRENDA 1 SWD

Phoenix Operating LLC ยท McKenzie County, ND ยท File #43042 ยท Generated 2026-08-22 02:26

API
3305310831
Target Formation
Dakota Group (Inyan Kara Formation)
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Permit expiration deadline: well must be completed as SWD by June 16, 2027, or permit expires.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 3 of 10, UIC stipulations
Creates a hard deadline for drilling, completion, and facility construction, driving operator urgency and contractor scheduling.
2027-06-16 General Oilfield Services
Tier 3 Approach permit includes a temporary culvert (18x110) with installation date 3/26/2026 and removal date 3/26/2027.โฐ TIME-SENSITIVE
๐Ÿ“„ Appendix F, Approach Permit Application
Specific temporary infrastructure with a one-year lifespan, indicating planned construction activity window.
2026-03-26 General Oilfield Services
Tier 3 Requirement to submit detailed SWD facility schematic and construction dates within 30 days following construction completion.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 2 of 10, UIC stipulations
Mandates specific post-construction documentation with a tight deadline, not a routine filing.
Relative General Oilfield Services
Tier 3 Pressure test on high-pressure injection pipeline (100 psi over permitted max) required prior to injection, with results reported on a Sundry Form.
๐Ÿ“„ Page 2 of 10, UIC stipulations
Specific, non-routine testing and reporting requirement for the pipeline, not just the well.
Relative General Oilfield Services
Tier 3 Tank diking variance approved contingent on submission of as-built schematic after facility construction.
๐Ÿ“„ Page 3 of 10, UIC stipulations
Regulatory allowance with a post-construction compliance requirement. Indicates non-standard tank containment design.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling & Completion Services
Permit issued with spud notification requirement and a completion deadline of June 16, 2027. Anti-collision report shows proximity to four other planned wells on pad, indicating need for precise directional drilling.
Facility Construction & Tank Installation
Tank diking variance approved but requires as-built schematic post-construction. Detailed facility schematic required within 30 days of construction completion. Co-location with oil facilities implies coordinated build-out.
Pipeline & Pressure Testing
Specific regulatory requirement for pressure testing injection pipeline before operation. Need for installation and testing services.
Earthwork, Road Construction, & Culvert Installation
Approach permit approved with specific temporary culvert dates (install 3/26/2026, remove 3/26/2027). Road designs complete. Pad layout shows significant cut/fill volumes.
Environmental Monitoring & SCADA Integration
Operator committed to 24-hour SCADA with specific alarms. Requires installation, integration, and potentially ongoing monitoring services.