๐Ÿ›ข๏ธ SUN 5899 11-28 3BHP

ENERPLUS RESOURCES USA CORPORATION ยท Williams County, ND ยท File #43044 ยท Generated 2026-08-22 02:26

API
3310506840
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration on production liner (400' uncemented annulus at toe) for toe initiation via wireline pump-down, avoiding tubing/tractor.
๐Ÿ“„ Section 1.11 Wet Shoe, Fig. 1.1
Non-standard cementing/completion design to enable cost-effective toe initiation. Reveals operator's intent to optimize completion efficiency.
Unknown Completions / Frac
Tier 3 U-turn horizontal well with lateral closer than 500 feet to spacing unit boundary, requiring pre-approval of fracture stimulation procedures and as-built survey.
๐Ÿ“„ Page 2 of 11, Stipulations section
Indicates a complex well path design (U-turn) with regulatory hurdles; requires specialized completion planning and regulatory coordination before stimulation.
2026-06-17 Directional Drilling
Tier 3 Affidavit affirming Surface Use Agreement for off-lease drilling from this pad location.
๐Ÿ“„ AFFIDAVIT AFFIRMING SURFACE USE AGREEMENT
Well is drilled from a surface location outside the spacing unit (off-lease), requiring a formal surface use agreement. Indicates pad optimization across units.
2026-06-01 General Oilfield Services
Tier 3 Anticipated commencement date is June 7, 2025, but permit approval date is June 17, 2026.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 6 of 11, 1.8 Anticipated Starting Dates; Page 11 of 11, Approved Date
Permit approved over a year after anticipated start date. Suggests significant planning lead time, potential delays, or strategic pad timing.
2025-06-07 General Oilfield Services
Tier 3 Waiver requested for open hole logs (Acoustic/Sonic, Density/Porosity, Resistivity); only Cement Bond Log planned.
๐Ÿ“„ Page 4-5 of 11, PROPOSED LOGS; Page 6 of 11, 1.7 Evaluation Program
Operator is reducing evaluation program, relying on other data or offset wells. Deviates from routine logging suite.
Unknown Regulatory / Permitting
Tier 3 Operator must contact NDIC Field Inspector Marc Binns prior to location construction.
๐Ÿ“„ Page 1 of 11, Stipulations
Specific inspector named, indicating heightened regulatory oversight for this location/pad. Construction cannot start without direct contact.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
U-turn well design with tight boundary setbacks and anti-collision concerns (multiple nearby wells) requires precise planning and execution. TAKTIKAL DIRECTIONAL is already engaged.
Cementing Services
Wet shoe configuration requires specific over-displacement cementing design for the production liner. Non-routine cement job design needed.
Pad Construction & Earthwork
New pad construction with detailed design by NESET. Construction must be coordinated with NDIC Field Inspector Marc Binns prior to start. Anticipated start was 2025, but permit just approved in 2026, suggesting imminent mobilization.
Fracture Stimulation Design & Regulatory Coordination
U-turn well requires pre-approval of fracture stimulation procedures due to proximity to boundaries. Stimulation design must account for nearby fracture initiation points and regulatory submission.
Drill Cuttings Disposal
Operator listed multiple licensed disposal facilities; cuttings will be hauled to 'closest available facility.' Hauling and disposal services needed soon after drilling starts.