๐Ÿ›ข๏ธ HELSTAD 5899 11-28 2BHP

ENERPLUS RESOURCES USA CORPORATION ยท Williams County, ND ยท File #43045 ยท Generated 2026-08-22 02:27

API
3310506841
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration with 400' uncemented annulus at toe for wireline perforating
๐Ÿ“„ Page 1 of 11, Stipulations; Wet Shoe section diagrams
Non-standard cement design to enable cheaper toe initiation via wireline rather than tubing/tractor. Explicitly ties to north toe setback approval.
Unknown Completions / Frac
Tier 3 U-turn horizontal well with lateral closer than 500 feet to spacing unit boundary requiring pre-approved fracture stimulation procedures and as-built survey submission
๐Ÿ“„ Page 2 of 11, Conditions of Approval
Indicates complex well geometry with regulatory oversight; requires specialized completion planning and regulatory coordination before stimulation.
2026-06-17 Directional Drilling
Tier 3 Anticipated commencement date June 7, 2025 with 30-day drilling windowโฐ TIME-SENSITIVE
๐Ÿ“„ Anticipated Starting Dates section
Specific start date provided in planning documents, indicating firm operational timeline.
2025-06-07 General Oilfield Services
Tier 3 Waiver requested for all open hole logs; only Cement Bond Log planned from intermediate casing to surface shoe
๐Ÿ“„ Page 5 of 11, Proposed Logs; Page 6 of 11, Evaluation Program
Operator opting out of standard open hole logging suite, relying on cased hole evaluation only. Requires separate sundry for waiver.
Unknown Regulatory / Permitting
Tier 3 Closed mud system with no cuttings pit required; cuttings to be hauled to licensed disposal facility
๐Ÿ“„ Page 2 of 11, Permit Review Policy; Licensed Facilities section
Mandates specific waste handling approach with pre-selected disposal facility list. No on-site pit.
Unknown Mud / Fluids
Tier 3 Mandatory contact with NDIC Field Inspector Marc Binns prior to location construction
๐Ÿ“„ Page 2 of 11, Construction Commencement Notification
Specific inspector named; indicates heightened regulatory scrutiny or site-specific conditions requiring pre-construction coordination.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
U-turn well with tight boundary constraints requires precise directional control and frequent surveys; anti-collision concerns with multiple existing wells.
Cementing Services
Wet shoe configuration demands precise cement displacement; surface and intermediate casing require specific centralizer placement and testing.
Waste Management & Hauling
Closed mud system mandates cuttings hauling to licensed facilities; filter sock container required on-site; list of pre-approved disposal facilities provided.
Regulatory Compliance & Coordination
Mandatory contact with specific NDIC inspector before construction; as-built survey and frac procedure approval required for boundary exception.
Wireline Perforating
Wet shoe design specifically enables wireline toe initiation; opportunity for stage 1 perforating services.