| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe design with ability to frac out the toe, plus hydraulic toe sleeve as backup ๐ Page 1 of 11 and Page 8 of 11 Non-standard liner completion with redundant frac-out capability; indicates focus on toe stimulation and contingency planning |
Unknown | Completions / Frac |
| Tier 3 |
U-turn horizontal well with lateral closer than 500 feet to spacing unit boundary, requiring pre-approval of fracture stimulation procedures and as-built survey submission ๐ Page 2 of 11, Conditions of Approval Non-standard well geometry triggers additional regulatory scrutiny and specialized completion planning; indicates complex pad development near unit boundaries |
2026-06-17 | Directional Drilling |
| Tier 3 |
Mandatory notification to Continental Resources for wells entering Bakken system outside target spacing unit per NDIC Order 31848 ๐ Affidavit section after aerial maps Regulatory requirement for cross-unit drilling with specific competitor notification; reveals pad development strategy affecting adjacent units |
2026-06-16 | Drilling Rigs |
| Tier 3 |
Closed mud system with no cuttings pit and mandatory disposal at Smoky Butte Environmental LLC ๐ Page 2 of 11 and Page 8 of 11 Pre-selected disposal vendor and specific environmental controls; indicates operator's waste management strategy is locked in |
Unknown | Mud / Fluids |
| Tier 3 |
Mandatory contact with NDIC Field Inspector Robert Stafford (701-946-8204) prior to location constructionโฐ TIME-SENSITIVE ๐ Page 2 of 11, Construction Commencement Notification Specific inspector named with direct contact requirement; indicates heightened oversight or site-specific concerns |
Relative | General Oilfield Services |