| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe configuration planned for production liner to enable wireline perforating instead of more expensive tubing/tractor methods. ๐ Section 1.11 Wet Shoe Deliberate engineering choice to reduce completion costs by creating 400' of uncemented annulus at toe for wireline access. |
Unknown | Completions / Frac |
| Tier 3 |
U-turn horizontal well design with lateral closer than 500 feet to spacing unit boundary, requiring pre-approval of fracture stimulation procedures and as-built survey. ๐ Page 2 of 11 Non-standard well geometry triggers specific regulatory oversight and pre-completion approval requirements, indicating complex drilling and completion planning. |
2026-06-18 | Directional Drilling |
| Tier 3 |
Anticipated commencement date of June 7, 2025 with approximately 30 drilling days.โฐ TIME-SENSITIVE ๐ Section 1.8 Anticipated Starting Dates Specific start date provided in planning documents, indicating firm operational timeline. |
2025-06-07 | General Oilfield Services |
| Tier 3 |
Closed mud system with no cuttings pit required, with cuttings to be hauled to licensed disposal facility. ๐ Page - 2 of 11 and Section 1.10 Specific waste handling requirement with named disposal facilities, indicating environmental compliance focus. |
Unknown | Mud / Fluids |
| Tier 3 |
Indirect heater with setback exemption (Case No. 28949 Order No. 31500) allows placement within 60 feet of well head and 21 feet of oil tank. ๐ FACILITY STATEMENT Non-standard facility design using regulatory exemption for equipment placement. |
Unknown | General Oilfield Services |
| Tier 3 |
Operator must contact NDIC Field Inspector Marc Binns (701-220-5989) prior to location construction.โฐ TIME-SENSITIVE ๐ Page - 2 of 11 Specific inspector named with direct contact requirement before construction begins, indicating heightened regulatory oversight. |
Relative | General Oilfield Services |