โ† Back to Daily Permits

๐Ÿ›ข๏ธ MHA BUCKWHEAT 4892 21-19 3B

ENERPLUS RESOURCES USA CORPORATION ยท Dunn County, ND ยท File #43051 ยท Generated 2026-08-22 02:29

API
3302505210
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (8)

Tier Signal Date Service Impact
Tier 2 Approval conditional on 500' north/south and 150' east/west setbacks within 2560-acre spacing unit, with east setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe.
๐Ÿ“„ Stipulations section, Permit Information
Specific setback conditions tied to liner cementing and frac-out capability indicate a tailored regulatory approval for pad-edge drilling, not a generic permit.
Unknown Completions / Frac
Tier 3 Bureau of Indian Affairs approves amendment to right-of-way (FBOG101061) adding five well bores including this well, with approval date June 16, 2026.โฐ TIME-SENSITIVE
๐Ÿ“„ Amendment of Grant of Easement, BIA Memorandum
Federal surface use amendment approved post-permit, specific to Fort Berthold Reservation land, with explicit well additions.
2026-06-16 Drilling Rigs
Tier 3 NDIC Petroleum Engineer Nathaniel Erbele emails operator on March 3, 2026, flagging that permit may be subject to Federal permit via BLM due to spacing unit location.โฐ TIME-SENSITIVE
๐Ÿ“„ Email from Nathaniel Erbele dated March 3, 2026
Regulatory ambiguity flagged late in process (permit approved June 19, 2026), suggesting potential dual state/federal jurisdiction.
2026-03-03 General Oilfield Services
Tier 3 Operator asserts waiver of adjacent operator notification for drill-back because Enerplus is the operator of the adjacent spacing unit.
๐Ÿ“„ Letter dated Tuesday, November 4, 2025
Drill-back into adjacent unit is planned, but notification waived because operator controls both units, revealing multi-unit development strategy.
2025-11-04 Regulatory / Permitting
Tier 3 Dunn County Commission granted section line encroachment permission for multi-well pad on August 18, 2016, specific to originally named wells.
๐Ÿ“„ Dunn County Commission letter dated August 18, 2016
County approval is pad-specific and dated years prior; new wells added via amendment may rely on original approval.
2016-08-18 Drilling Rigs
Tier 3 Facility design uses indirect heater with setback exemption under NDIC Case No. 28949 Order No. 31500, allowing placement within 60 ft of wellhead and 21 ft of oil tank.
๐Ÿ“„ Facility Statement
Non-standard equipment siting approved via specific commission order, enabling tighter pad layout.
Unknown General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Clark Schackelford (701-495-2034) prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Conditions of Approval
Direct, named inspector contact required before construction starts, indicating heightened regulatory oversight or site-specific sensitivities.
Relative General Oilfield Services
Tier 3 If pad is expanded, Enerplus must receive additional approval from Dunn County for section line encroachment pursuant to NDCC 24-06-28.
๐Ÿ“„ Conditions of Approval
Explicit county-level approval required for any pad expansion, beyond standard state permits.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Surface Construction & Pad Building
BIA right-of-way amendment approved June 16, 2026; construction cannot start until NDIC Field Inspector is contacted. Timing is immediate post-approval.
Directional Drilling & Anti-Collision Services
Anti-collision report shows multiple existing wellbores nearby; drilling must maintain separation factors. High-precision steering required in congested pad.
Cementing & Liner Services
Wet shoe liner design requires precise cement over-displacement; cementing contractor must execute to spec for toe initiation method.
Wireline Perforating
Wet shoe configuration enables pump-down wireline for Stage 1 perforating; wireline services needed immediately after liner installation.
Federal & Tribal Regulatory Coordination
BLM may require additional federal permit per NDIC email; services to navigate BLM and BIA approvals may be needed.