| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditional on 500' north/south and 150' east/west setbacks within 2560-acre spacing unit, with east setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe. ๐ Stipulations section, first page Specific setback requirements tied to a unique wellbore construction (wet shoe) that enables a particular completion technique, indicating a deliberate engineering choice to manage boundary constraints. |
Unknown | Completions / Frac |
| Tier 2 |
Cementing program for production liner includes 'wet shoe' configuration with intentional over-displacement creating ~400' of uncemented annulus at toe to allow pump-down perforating guns on wireline. ๐ Wellbore Construct Features and Cementing Program sections Specific completion design choice to reduce cost by avoiding tubing-conveyed or tractor perforating for first stage. |
Unknown | Completions / Frac |
| Tier 3 |
Bureau of Indian Affairs approves amendment to right-of-way (FBOG101061) on 06/16/2026, adding five additional well bores to existing Grains Pad with no new surface disturbance. ๐ BIA memorandum and amendment documents Federal right-of-way amendment finalized, legally enabling multi-well pad development without expanding footprint, indicating coordinated surface planning. |
2026-06-16 | Drilling Rigs |
| Tier 3 |
NDIC Petroleum Engineer Nathaniel Erbele emails operator on 3/3/2026 noting permit may be subject to Federal permit, instructing contact with BLM Dickinson office.โฐ TIME-SENSITIVE ๐ Email dated 3/3/2026 8:28 AM Late-stage regulatory flag for potential federal oversight, introducing an additional agency coordination step post-state approval. |
2026-03-03 | Drilling Rigs |
| Tier 3 |
Operator requests waiver from notifying adjacent operator for drilling from surface location outside spacing unit, as Enerplus is the operator of the adjacent unit. ๐ Letter dated Tuesday, November 4, 2025 Explicit regulatory strategy to streamline approval by leveraging common ownership, avoiding a standard notification step. |
2025-11-04 | Regulatory / Permitting |
| Tier 3 |
Anticollision report shows multiple Level 3 separation factor warnings with existing wells (e.g., EXIST HZ FINCH, EXIST HZ WHEAT, MHA BARLEY, etc.), indicating tight wellbore spacing. ๐ Anticollision Report section Detailed anti-collision analysis reveals high-density drilling environment with specific nearby wellbores flagged for close approach. |
2025-10-15 | Directional Drilling |
| Tier 3 |
Operator asserts 'closed mud system with no cuttings pit' and requires remote/automatic shutoff devices on all equipment. ๐ Stipulations section, first page Non-standard environmental and safety controls mandated, exceeding basic regulatory minimums. |
Unknown | Mud / Fluids |
| Tier 3 |
Operator must contact NDIC Field Inspector Clark Schackelford at 701-495-2034 prior to location construction.โฐ TIME-SENSITIVE ๐ Stipulations section, first page Direct, named inspector contact is required before pad construction begins, indicating heightened regulatory oversight or specific site conditions. |
Relative | General Oilfield Services |
| Tier 3 |
If pad is expanded, Enerplus must receive additional approval from Dunn County for section line encroachment pursuant to NDCC 24-06-28. ๐ Stipulations section, first page Pre-conditions any pad expansion on county approval, indicating potential for future pad growth but with a regulatory gate. |
Relative | General Oilfield Services |