โ† Back to Daily Permits

๐Ÿ›ข๏ธ MHA MILLET 4892 21-19 5B

ENERPLUS RESOURCES USA CORPORATION ยท Dunn County, ND ยท File #43053 ยท Generated 2026-08-22 02:30

API
3302505212
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Approval conditional on 500' north/south and 150' east/west setbacks within 2560-acre spacing unit, with east setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe.
๐Ÿ“„ Stipulations section, first page
Specific setback requirements tied to a unique wellbore isolation and completion design (wet shoe) that impacts drilling trajectory and completion strategy.
Unknown Completions / Frac
Tier 3 BIA Right-of-Way amendment (FBOG101061) approved June 16, 2026, adding five well bores to existing pad with no additional surface disturbance.โฐ TIME-SENSITIVE
๐Ÿ“„ BIA Memorandum and Amendment documents
Federal surface use approval specifically for pad densification, confirming multi-well pad strategy on tribal lands.
2026-06-16 Drilling Rigs
Tier 3 Drill-back policy notification waiver requested because Enerplus is the operator of the adjacent spacing unit.
๐Ÿ“„ Letter to NDIC dated Tuesday, November 4, 2025
Operator is leveraging its own leasehold position to streamline regulatory notification for wells entering adjacent units.
2025-11-04 Regulatory / Permitting
Tier 3 Facility design uses an indirect heater with setback exemption under NDIC Case No. 28949 Order No. 31500, allowing placement within 60' of wellhead and 21' of oil tank.
๐Ÿ“„ Facility Statement, embedded in detailed technical section
Non-standard facility layout enabled by a specific, pre-existing regulatory exemption.
Unknown General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Clark Schackelford prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section, first page
Mandatory pre-construction contact with a named inspector creates a specific regulatory gate.
Relative Drilling Rigs
Tier 3 Operator acknowledges they will contact NDIC Field Inspector to seek proper plug back procedures in the event of a sidetrack.
๐Ÿ“„ Operator Assertions, page 7
Pre-commitment to a specific regulatory protocol for sidetracks, which are non-routine operations.
Relative Directional Drilling
Tier 3 If pad is expanded, Enerplus must receive additional approval from Dunn County for section line encroachment per NDCC 24-06-28.
๐Ÿ“„ Stipulations section, first page
Pad expansion is explicitly contemplated and requires county-level approval, indicating potential future pad growth.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / Surveying
High-density pad with strict anti-collision protocols (1.2 safety factor, frequent surveys). Anticollision report shows Level 3 warnings with nearby wells. Requires precise wellbore placement.
Cementing & Wellbore Isolation
Complex cement program for 7" casing and 4-1/2" liner. Specific 'wet shoe' design for the production liner requires precise execution to enable cost-effective completion.
Surface Construction & Earthwork
Pad is on tribal land with an active BIA ROW. Any expansion requires Dunn County approval. Construction must contact NDIC inspector Clark Schackelford prior to start.
Completions (Stimulation & Perforating)
Wet shoe design creates a specific operational sequence for toe initiation. Frac design must account for ability to 'frac out the shoe' as per setback condition.