| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditional on 500' north/south and 150' east/west setbacks within 2560-acre spacing unit, with east setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe. ๐ Stipulations section, first page Specific setback requirements tied to a unique wellbore isolation and completion design (wet shoe) that impacts drilling trajectory and completion strategy. |
Unknown | Completions / Frac |
| Tier 3 |
BIA Right-of-Way amendment (FBOG101061) approved June 16, 2026, adding five well bores to existing pad with no additional surface disturbance.โฐ TIME-SENSITIVE ๐ BIA Memorandum and Amendment documents Federal surface use approval specifically for pad densification, confirming multi-well pad strategy on tribal lands. |
2026-06-16 | Drilling Rigs |
| Tier 3 |
Drill-back policy notification waiver requested because Enerplus is the operator of the adjacent spacing unit. ๐ Letter to NDIC dated Tuesday, November 4, 2025 Operator is leveraging its own leasehold position to streamline regulatory notification for wells entering adjacent units. |
2025-11-04 | Regulatory / Permitting |
| Tier 3 |
Facility design uses an indirect heater with setback exemption under NDIC Case No. 28949 Order No. 31500, allowing placement within 60' of wellhead and 21' of oil tank. ๐ Facility Statement, embedded in detailed technical section Non-standard facility layout enabled by a specific, pre-existing regulatory exemption. |
Unknown | General Oilfield Services |
| Tier 3 |
Operator must contact NDIC Field Inspector Clark Schackelford prior to location construction.โฐ TIME-SENSITIVE ๐ Stipulations section, first page Mandatory pre-construction contact with a named inspector creates a specific regulatory gate. |
Relative | Drilling Rigs |
| Tier 3 |
Operator acknowledges they will contact NDIC Field Inspector to seek proper plug back procedures in the event of a sidetrack. ๐ Operator Assertions, page 7 Pre-commitment to a specific regulatory protocol for sidetracks, which are non-routine operations. |
Relative | Directional Drilling |
| Tier 3 |
If pad is expanded, Enerplus must receive additional approval from Dunn County for section line encroachment per NDCC 24-06-28. ๐ Stipulations section, first page Pad expansion is explicitly contemplated and requires county-level approval, indicating potential future pad growth. |
Unknown | General Oilfield Services |