| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe completion configuration specified to enable wireline pump-down perforating instead of more expensive tubing/tractor methods ๐ Wellbore Construction Details section Specific completion engineering choice that affects perforating methodology and cost structure |
Unknown | Completions / Frac |
| Tier 3 |
Bureau of Indian Affairs right-of-way amendment approved for five additional wells on existing pad with no new surface disturbance ๐ Amendment #1 to ROW No. FBOG101061 Federal approval for pad expansion without additional surface disturbance indicates optimized pad design and pre-negotiated tribal agreements |
2026-06-16 | Drilling Rigs |
| Tier 3 |
Wellbore enters target spacing unit from outside, requiring regulatory notification waiver since Enerplus is also operator of adjacent unit ๐ Letter dated Tuesday, November 4, 2025 Indicates complex pad development strategy with wells originating outside target units, requiring specific regulatory compliance and operator coordination |
2025-11-04 | Drilling Rigs |
| Tier 3 |
Anti-collision analysis shows Level 3 separation factor warnings with nearby wells (MHA Buckwheat 4892 21-19 3B and MHA Oat 4892 21-19 4B)โฐ TIME-SENSITIVE ๐ Anticollision Report dated 16 October, 2025 Proactive anti-collision planning with specific separation factor warnings indicates complex well spacing requiring precise directional control |
2025-10-16 | Directional Drilling |
| Tier 3 |
Permit requires contact with NDIC Field Inspector Clark Schackelford prior to location construction ๐ Conditions of Approval section Specific inspector assignment and pre-construction notification requirement indicates heightened regulatory oversight |
Unknown | General Oilfield Services |