| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 1 |
Approval conditional on 500' north/south and 150' east/west setbacks within 2560-acre spacing unit, with east setback based on production liner cemented in lateral with wet shoe configuration for frac-out capability. ๐ Stipulations section, Permit Review Policy Specific setback requirements tied to engineered completion design (wet shoe) rather than standard regulatory minimums, indicating tailored geosteering and completion constraints. |
Unknown | Completions / Frac |
| Tier 2 |
Wet shoe configuration detailed: 400' uncemented annulus at toe, allowing wireline pump-down of first stage perforating guns, avoiding tubing/tractor. ๐ Wellbore Construct Features / Details of Standard Wet Shoe Non-standard liner cementation design for cost-effective toe initiation, specifying exact method for first-stage perforating. |
Unknown | Completions / Frac |
| Tier 3 |
Amendment #1 to ROW FBOG101061 approved 06/16/2026, adding five well bores with no additional surface disturbance, and renaming existing wells. ๐ BIA Amendment and Approval documents BIA right-of-way modification finalized after permit submission, indicating ongoing surface use negotiations concurrent with drilling planning. |
2026-06-16 | Drilling Rigs |
| Tier 3 |
BLM notification required for federal permit within spacing unit; NDIC engineer directs operator to contact BLM Dickinson office.โฐ TIME-SENSITIVE ๐ Email dated 3/3/2026 from Nathaniel Erbele Federal overlay on state permit; additional BLM coordination required post-NDIC approval. |
2026-03-03 | General Oilfield Services |
| Tier 3 |
Waiver requested for adjacent operator notification (Order No. 31973) because Enerplus is the operator of the adjacent spacing unit. ๐ Letter dated Tuesday, November 4, 2025 Operator leveraging its own adjacent unit ownership to streamline regulatory process, avoiding mandatory notification timelines. |
2025-11-04 | Regulatory / Permitting |
| Tier 3 |
Anticollision report dated 16 October 2025 shows Level 3 warnings with multiple existing wellbores, including same-pad wells (e.g., MHA BARLEY, BUCKWHEAT, GRAIN, MILLET, OAT). ๐ Anticollision Report High-density pad with active anti-collision monitoring; Level 3 warnings indicate close approaches requiring precise directional control. |
2025-10-16 | Directional Drilling |
| Tier 3 |
Closed mud system with no cuttings pit required; cuttings disposal to licensed facility (list provided). ๐ Stipulations and Licensed Facilities section Mandated closed-loop drilling and specific off-site cuttings disposal, eliminating onsite pits. |
Unknown | Mud / Fluids |
| Tier 3 |
Operator must contact NDIC Field Inspector Clark Schackelford (701-495-2034) prior to location construction.โฐ TIME-SENSITIVE ๐ Conditions of Approval Personalized regulatory pre-construction contact requirement, not a generic office notification. |
Relative | General Oilfield Services |
| Tier 3 |
If pad is expanded, Enerplus must receive additional approval from Dunn County for section line encroachment pursuant to NDCC 24-06-28. ๐ Conditions of Approval Explicit county-level approval required for any pad expansion, indicating potential for future pad modifications subject to local jurisdiction. |
Relative | General Oilfield Services |