โ† Back to Daily Permits

๐Ÿ›ข๏ธ MHA RICE 4892 21-19 8B

ENERPLUS RESOURCES USA CORPORATION ยท Dunn County, ND ยท File #43056 ยท Generated 2026-08-22 02:32

API
3302505215
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (9)

Tier Signal Date Service Impact
Tier 1 Approval conditional on 500' north/south and 150' east/west setbacks within 2560-acre spacing unit, with east setback based on production liner cemented in lateral with wet shoe configuration for frac-out capability.
๐Ÿ“„ Stipulations section, Permit Review Policy
Specific setback requirements tied to engineered completion design (wet shoe) rather than standard regulatory minimums, indicating tailored geosteering and completion constraints.
Unknown Completions / Frac
Tier 2 Wet shoe configuration detailed: 400' uncemented annulus at toe, allowing wireline pump-down of first stage perforating guns, avoiding tubing/tractor.
๐Ÿ“„ Wellbore Construct Features / Details of Standard Wet Shoe
Non-standard liner cementation design for cost-effective toe initiation, specifying exact method for first-stage perforating.
Unknown Completions / Frac
Tier 3 Amendment #1 to ROW FBOG101061 approved 06/16/2026, adding five well bores with no additional surface disturbance, and renaming existing wells.
๐Ÿ“„ BIA Amendment and Approval documents
BIA right-of-way modification finalized after permit submission, indicating ongoing surface use negotiations concurrent with drilling planning.
2026-06-16 Drilling Rigs
Tier 3 BLM notification required for federal permit within spacing unit; NDIC engineer directs operator to contact BLM Dickinson office.โฐ TIME-SENSITIVE
๐Ÿ“„ Email dated 3/3/2026 from Nathaniel Erbele
Federal overlay on state permit; additional BLM coordination required post-NDIC approval.
2026-03-03 General Oilfield Services
Tier 3 Waiver requested for adjacent operator notification (Order No. 31973) because Enerplus is the operator of the adjacent spacing unit.
๐Ÿ“„ Letter dated Tuesday, November 4, 2025
Operator leveraging its own adjacent unit ownership to streamline regulatory process, avoiding mandatory notification timelines.
2025-11-04 Regulatory / Permitting
Tier 3 Anticollision report dated 16 October 2025 shows Level 3 warnings with multiple existing wellbores, including same-pad wells (e.g., MHA BARLEY, BUCKWHEAT, GRAIN, MILLET, OAT).
๐Ÿ“„ Anticollision Report
High-density pad with active anti-collision monitoring; Level 3 warnings indicate close approaches requiring precise directional control.
2025-10-16 Directional Drilling
Tier 3 Closed mud system with no cuttings pit required; cuttings disposal to licensed facility (list provided).
๐Ÿ“„ Stipulations and Licensed Facilities section
Mandated closed-loop drilling and specific off-site cuttings disposal, eliminating onsite pits.
Unknown Mud / Fluids
Tier 3 Operator must contact NDIC Field Inspector Clark Schackelford (701-495-2034) prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Conditions of Approval
Personalized regulatory pre-construction contact requirement, not a generic office notification.
Relative General Oilfield Services
Tier 3 If pad is expanded, Enerplus must receive additional approval from Dunn County for section line encroachment pursuant to NDCC 24-06-28.
๐Ÿ“„ Conditions of Approval
Explicit county-level approval required for any pad expansion, indicating potential for future pad modifications subject to local jurisdiction.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / MWD
Level 3 anti-collision warnings require high-precision drilling; pad is dense with existing wells.
Cementing Services
Wet shoe design requires precise cement over-displacement; liner and production casing cement volumes specified.
Wireline & Perforating
First-stage perforations planned via wireline pump-down due to wet shoe; must be coordinated with frac design.
Drilling Waste Hauling & Disposal
Closed mud system mandated; cuttings must go to licensed off-site facility; list of approved facilities provided.
Pad Construction & Earthwork
County approval required for any pad expansion; existing pad may be modified contingent on Dunn County.