| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Permit approval is conditional on a 150' setback from N/S boundaries and a 1220' setback from E/W boundaries within the 2560-acre unit, based on a production liner cemented in the lateral with a wet shoe. ๐ Page 1, 'STIPULATIONS' section under Conditions of Approval Setback distances are tied directly to the well's specific construction (wet shoe liner). This is a non-standard, geometry-dependent regulatory condition, not a generic rule. |
Unknown | Completions / Frac |
| Tier 2 |
Wet shoe configuration for production liner to enable wireline pump-down of first stage perforating guns, avoiding more expensive tubing/tractor methods. ๐ Section 1.11 Wet Shoe and accompanying schematic/discussion Reveals a specific, cost-saving completion design choice that deviates from standard cemented liner practices. This indicates operator focus on reducing completion costs and may influence service demand (wireline vs. tubing conveyed perforating). |
Unknown | Completions / Frac |
| Tier 3 |
Anticipated commencement date is July 15, 2025, but permit was approved June 22, 2026. This suggests a significant schedule shift or delay.โฐ TIME-SENSITIVE ๐ Section 1.8 Anticipated Starting Dates (Jul 15, 2025) and APPROVED BY date (06/22/2026) The ~11 month gap between anticipated start and permit approval indicates planning/regulatory delays. The approved date is in the future (2026), suggesting this is a forward-looking permit. |
2026-06-22 | General Oilfield Services |
| Tier 3 |
BLM notification required for permit applications within a federal spacing unit (Sections 5,8,17,20 T150N R102W). NDIC explicitly instructed operator to contact BLM Dickinson.โฐ TIME-SENSITIVE ๐ Email from Doug Jackson (NDIC) to Melissa Szudera dated 12/3/2025 Reveals overlapping federal jurisdiction and an additional regulatory step. The email is a direct, time-stamped intervention from NDIC to the operator. |
2025-12-03 | General Oilfield Services |
| Tier 3 |
Well is part of a multi-well pad (2B, 3B, 4B, 5BX) drilled from surface location outside the target spacing unit, requiring a Surface Use Agreement and prior notification to adjacent operator (Devon Energy). ๐ AFFIDAVIT AFFIRMING SURFACE USE AGREEMENT and AFFIDAVIT AFFIRMING DRILL-BACK NOTIFICATION Demonstrates complex pad development strategy with 'off-lease' drilling, requiring formal agreements and inter-operator coordination. Notification to Devon was sent on a specific date. |
2025-11-20 | General Oilfield Services |
| Tier 3 |
Permit includes explicit requirement to contact NDIC Field Inspector Will Ryan (701-770-6684) prior to location construction.โฐ TIME-SENSITIVE ๐ Page 2, 'Construction Commencement Notification' section Specifies a named individual and direct contact requirement, indicating a heightened level of regulatory oversight or site-specific conditions requiring pre-construction coordination. |
Relative | General Oilfield Services |