| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe completion design with intentional 400' uncemented annulus at liner toe for wireline perforating ๐ WELL DETAILS: TWO PENCE FEDERAL 5102 43-32 4B, PLAN #3 Non-standard cementing approach to enable cheaper wireline perforating instead of tubing-conveyed or tractor methods |
Unknown | Completions / Frac |
| Tier 3 |
Off-spacing drilling from surface location outside target unit requiring Surface Use Agreement and drill-back notification to adjacent operator ๐ AFFIDAVIT AFFIRMING SURFACE USE AGREEMENT, AFFIDAVIT AFFIRMING DRILL-BACK NOTIFICATION Well is drilled from pad in Section 32 into target unit in Sections 5,8,17,20 (T150N-R102W), requiring special regulatory compliance and surface owner coordination |
2026-06-10 | General Oilfield Services |
| Tier 3 |
Anti-collision critical with 0.29 ft separation from offset well TWO PENCE FEDERAL 5102 43-32 5BXโฐ TIME-SENSITIVE ๐ Anticollision Report Extremely tight well spacing (0.29 ft) requires precise directional control and real-time monitoring |
2026-05-18 | Directional Drilling |
| Tier 3 |
BLM notification required due to federal minerals in spacing unit ๐ Email from Doug Jackson (NDIC) to Melissa Szudera dated 12/3/2025 Spacing unit contains federal minerals requiring BLM coordination beyond standard NDIC permitting |
2025-12-03 | General Oilfield Services |
| Tier 3 |
Indirect heater with NDIC setback exemption (Case No. 28949 Order No. 31500) allowing 60' from wellhead ๐ FACILITY STATEMENT Non-standard facility design with regulatory variance for tighter spacing |
Unknown | General Oilfield Services |
| Tier 3 |
Must contact NDIC Field Inspector Will Ryan prior to location constructionโฐ TIME-SENSITIVE ๐ Page 2 of 11, Construction Commencement Notification Mandatory pre-construction field inspection contact specified by name/number |
Relative | General Oilfield Services |