| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditional on 150' north setback due to production liner cemented in lateral with wet shoe and ability to frac out the shoe ๐ Conditions of Approval Unusual setback requirement (150' vs standard 500') tied to specific completion design (cemented liner with wet shoe). Indicates planned frac-out operation at shoe. |
Unknown | Completions / Frac |
| Tier 3 |
Pad is part of 6-well development (Clearwater 33-3024H, 50-3024H, J 42-3024H, 51-3018H, 44-3007H, 41-3007H) on CLEARWATER 31 NENE 2 pad ๐ Notice of Application letters, pad layout diagrams Multi-well pad with named wells indicates batch drilling/completion campaign. Pad expansion from 3.69 to 16.50 acres with significant earthwork (57,500 CY cut). |
2026-06-09 | General Oilfield Services |
| Tier 3 |
Silica flour will be used in Production Liner cement slurry; added to intermediate tail cement if BH temps >230ยฐF ๐ Casing & Cementing Program notes Specific cement additive requirement for high-temperature stabilization. Conditional on bottomhole temperature. |
Unknown | Drilling Rigs |
| Tier 3 |
Operator acknowledges 21-31 day notice requirement to adjacent pool operators for fracs within 2,640' ๐ Operator Assertions Explicit acknowledgment of extended notification window for frac operations, indicating planned hydraulic fracturing and proximity to other operators. |
Unknown | Completions / Frac |
| Tier 3 |
EOG must contact NDIC Field Inspector Dylan Roach at 701-770-1981 prior to commencing operationsโฐ TIME-SENSITIVE ๐ Conditions of Approval Personalized regulatory contact requirement, not generic office number. Indicates heightened oversight or specific inspector assignment. |
Relative | General Oilfield Services |
| Tier 3 |
Production liner is 4-1/2" liner with liner hanger and pack-off assembly; toe assembly includes burst plug to initiate fracture process ๐ Casing & Cementing Program, Toe Assembly notes Specific liner hanger/pack-off assembly specified. Toe frac design using burst plug indicates planned open-hole shoe frac. |
Unknown | Completions / Frac |
| Tier 3 |
Drilling duration estimated at 60-90 days starting 'Upon Approval'โฐ TIME-SENSITIVE ๐ Drilling Plan - Anticipated starting date and duration Unusually long drilling duration (60-90 days) for a Bakken well. Indicates complex drilling or potential batch operations. |
Relative | General Oilfield Services |