| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval condition: West setback of 150' is based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe. ๐ Stipulations section, NDIC Field Order Info Reveals a specific, non-standard well design constraint tied to regulatory approval. The 'wet shoe' and requirement to 'frac out the shoe' indicates a planned completion technique that influences cementing and perforation strategy, deviating from a standard cemented liner. |
Unknown | Completions / Frac |
| Tier 3 |
Affidavit confirms executed surface use agreement with landowners (Meyer D. & Diane J. Kinnoin) authorizing off-spacing unit facilities placement for all 6 wells on pad. ๐ AFFIDAVIT IN RE OFF LEASE MEASUREMENT Shows advanced surface rights resolution for the entire pad. This is a prerequisite for permit approval and indicates the operator has secured necessary agreements, de-risking the project timeline. |
2026-06-04 | Drilling Rigs |
| Tier 3 |
Pad is part of a 6-well development ('CLEARWATER 31 NENE 2') with significant earthwork: 57,500 CY cut, 30,665 CY fill, total disturbance 16.50 acres. ๐ Pad construction data and plats throughout document Reveals scale and persistence of opportunity. This is not a single well but a major pad development. Earthwork volumes and detailed engineering (KLJ) indicate a large, planned multi-well project with extended activity. |
2026-04-27 | General Oilfield Services |
| Tier 3 |
Operator must contact NDIC Field Inspector Dylan Roach (701-770-1981) prior to commencing operations.โฐ TIME-SENSITIVE ๐ Stipulations section, Conditions of Approval Identifies a specific, named regulatory point of contact and a pre-spud notification requirement. This is a direct, personal line for field operations, not a generic office number. |
Relative | General Oilfield Services |
| Tier 3 |
Explicit request to NDIC: 'EOG Resources, Inc. respectfully requests permission to frac out the toe.' ๐ Drilling Plan, Production Liner & Cementing Notes Directly states operator's completion intent for a specific technique (toe frac). This is a formal request embedded in the drilling plan, not a post-drill decision. |
Unknown | Completions / Frac |