๐Ÿ›ข๏ธ Clearwater 51-3018H

EOG Resources, Inc. ยท Mountrail County, ND ยท File #43064 ยท Generated 2026-08-22 02:35

API
3306105703
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Permit stipulation based on a 'production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.'
๐Ÿ“„ Page 2 of 10, 'Conditions of Approval'
The 150' north setback is explicitly tied to a specific, non-standard completion design (cemented liner with wet shoe). This is a design-for-regulation compromise.
2026-06-25 Completions / Frac
Tier 3 Specific regulatory condition requiring contact with NDIC Field Inspector Dylan Roach (701-770-1981) prior to commencing operations.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 2 of 10, 'Construction Commencement Notification'
Identifies a named, individual regulator who must be contacted directly before spud. This creates a specific, personal gatekeeper for operations, not just a generic office notification.
2026-06-25 General Oilfield Services
Tier 3 Affidavit confirms executed surface use agreement with landowners (Meyer D. & Diane J. Kinnoin) authorizing 'off-spacing unit facilities placement'.
๐Ÿ“„ 'AFFIDAVIT IN RE OFF LEASE MEASUREMENT'
Pre-emptively resolves potential surface location conflicts by securing landowner agreement for off-spacing facilities. Shows proactive surface relations and legal due diligence.
2026-06-04 General Oilfield Services
Tier 3 Pad is part of a 6-well mega-pad ('CLEARWATER 31 NENE 2') with significant, engineered pad construction (16.5 acres, ~57,500 CY cut, ~30,665 CY fill).
๐Ÿ“„ Pad construction plat pages (multiple), 'Pad Construction Data'
Scale of earthwork is substantial and detailed. The pad hosts six named wells (including this one), indicating a major, coordinated development campaign.
2026-04-27 General Oilfield Services
Tier 3 Operator explicitly requests permission 'to frac out the toe' in the drilling program notes.
๐Ÿ“„ Cementing Program section, 'Production Liner & Cementing' notes
Directly states an operational intent (frac out the toe) that is integral to the approved well design and regulatory condition. This is not a routine program element.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil Construction & Earthmoving
Pad construction plans (dated April 2026) are approved and detailed, with massive cut/fill volumes (~88k CY total movement). Construction is imminent post-permit approval.
Directional Drilling / MWD Services
Detailed directional plan with specific survey tool (Superior MWD+IFR1+SAG+F) and program exists. Drilling anticipated to start 'Upon Approval' with a 60-90 day duration.
Specialized Cementing
The approved well design hinges on a cemented production liner with a wet shoe. Specific slurry designs (including Halliburton products) are specified, requiring precise execution.
Hydraulic Fracturing & Completion
Intent to 'frac out the shoe' is part of the plan. With a 60-90 day drilling window, frac planning and resource allocation for this and the other 5 pad wells is an immediate follow-on opportunity.
Environmental & Waste Management
Permit requires 'closed mud system with no cuttings pit' and an on-site leak-proof container for filter socks from spud through flowback. Specific waste handling protocols are mandated.