| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
North setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe ๐ Page 2 of 10, Stipulations section Unusual setback condition tied to specific completion technique (wet shoe) and frac-out capability, not standard spacing rules |
2026-06-25 | Completions / Frac |
| Tier 3 |
Closed mud system with no cuttings pit required ๐ Page 2 of 10, Stipulations section Non-standard environmental control requiring specialized mud handling equipment and procedures |
2026-06-25 | Mud / Fluids |
| Tier 3 |
Specific requirement to contact NDIC Field Inspector Dylan Roach (701-770-1981) prior to commencing operationsโฐ TIME-SENSITIVE ๐ Page 2 of 10, Stipulations section Direct inspector contact requirement creates a regulatory checkpoint before operations can begin, indicating heightened oversight or specific local concerns |
2026-06-25 | General Oilfield Services |
| Tier 3 |
Pad expansion from 3.69 to 16.50 acres with major earthwork (57,500 CY cut, 30,665 CY fill) ๐ Pad construction data Significant pad expansion indicates multi-well development and substantial site preparation |
2026-04-27 | General Oilfield Services |
| Tier 3 |
Deepest perforation at TD due to wet shoe ๐ Production Liner notes Completion design constraint forcing perforations to total depth, affecting stimulation planning |
Unknown | Completions / Frac |
| Tier 3 |
EOG requests permission to frac out the toe using standard burst plug ๐ Cementing program details, Production Liner section Explicit regulatory request for specific completion technique (frac out toe) indicates planned stimulation approach |
Unknown | Completions / Frac |
| Tier 3 |
Mission Canyon Formation identified as known H2S zone with attached H2S plan ๐ Abnormal Conditions section Specific H2S hazard identification requiring specialized safety protocols and equipment |
Unknown | General Oilfield Services |