๐Ÿ›ข๏ธ BW-Chad Allen-149-100-2826H-2

Hess Bakken Investments II, LLC ยท McKenzie County, ND ยท File #43067 ยท Generated 2026-08-22 02:37

API
3305310835
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 East setback reduced to 150' based on production liner cemented in lateral with wet shoe and ability to frac out the shoe.
๐Ÿ“„ Page 2 of 10, Conditions of Approval
Non-standard setback exception tied to specific completion design (cemented liner with wet shoe), indicating engineered solution for boundary proximity.
Unknown Completions / Frac
Tier 3 Cores and samples must be submitted to state library within 30 days (samples) and 180 days (cores) of drilling completion, with Form 4 required for extensions.โฐ TIME-SENSITIVE
๐Ÿ“„ First page letter from ND Mineral Resources
Strict regulatory deadlines with formal extension process; samples require specific preparation (washed, dried, standard envelopes/boxes).
2026-06-26 Drilling Rigs
Tier 3 Closed mud system with no cuttings pit required.
๐Ÿ“„ Page 2 of 10, Stipulations
Non-standard environmental control mandating specific drilling waste handling system.
Unknown Mud / Fluids
Tier 3 Regulatory requirement for filter sock leak-proof container on-site from spud through flowback, with specific placarding and cover requirements.
๐Ÿ“„ Page 9 of 10, Operator Assertions section
Non-standard environmental compliance requirement that dictates specific on-site waste management infrastructure throughout drilling and completion phases.
Unknown General Oilfield Services
Tier 3 Hess anti-collision standards require minimum 1.5 separation factor against existing wellbores, with exceptions managed by risk assessments and MOC's.
๐Ÿ“„ Page 7 of 10, Proposed Work
Operator-specific engineering standard exceeds typical requirements, indicating sophisticated collision avoidance protocols.
Unknown Directional Drilling
Tier 3 Mandatory notification to NDIC Field Inspector Will Ryan (701-770-6684) prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 3 of 10, Conditions of Approval
Specific inspector named with direct contact requirement before pad construction begins, indicating heightened regulatory oversight.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Environmental Compliance & Waste Management
Filter sock container requirement effective from spud through flowback; closed mud system mandates specialized handling; sample submission deadlines create immediate post-drilling services.
Civil Construction & Pad Development
Mandatory pre-construction notification to specific inspector; detailed pad design with 12.42 acre disturbance indicates imminent construction phase.
Directional Drilling & Surveying
Anti-collision standards require frequent surveys (every 93-100') and real-time monitoring; certified surveys must be submitted to NDIC within specific timeframe.
Cementing & Completions
Wet shoe design for boundary proximity requires specialized cementing; production liner with swell packers indicates specific completion methodology.