| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditional on 500' north/south and 150' east/west setbacks within 1920-acre spacing unit, with east setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe. ๐ Permit Information / Stipulations Specific setback conditions tied to completion design (wet shoe) and ability to frac out shoe, indicating a tailored regulatory approval with operational constraints. |
2026-06-25 | Completions / Frac |
| Tier 2 |
Cemented liner with wet shoe design to intentionally over-displace cement by 2 bbls, with first stage pumped out shoe and subsequent stages using plug and perf. ๐ Completion Equipment / Drilling Prognosis Specific completion design detail: wet shoe with rupture pins and plug chamber for visible bump, enabling 'frac out shoe' capability as per stipulation. |
Unknown | Completions / Frac |
| Tier 3 |
Notification letter sent to Kent and Anita Pedersen (occupied dwelling within 1320') on June 16, 2026, as required by NDCC 38-08.05.โฐ TIME-SENSITIVE ๐ Notification Letter to Surface Owners Formal regulatory notification executed close to permit date, indicating recent engagement with nearby residents and potential for last-minute objections. |
2026-06-16 | General Oilfield Services |
| Tier 3 |
Affidavit provided waiving adjacent unit notification requirements because Hess is operator of adjacent unit (BW-Helga Stenseth spacing unit). ๐ Letter to NDIC from Derek Abrahamsen (Hess) Operator leveraging control of adjacent unit to streamline regulatory process, indicating pad development strategy and unit consolidation. |
2026-06-09 | General Oilfield Services |
| Tier 3 |
Anticollision report shows Level 3 (Closest Approach) and Level 2 (Separation Factor) warnings with offset wells (e.g., BW-Chad Allen-2826H-2, H-4, H-5, LN-H1) on same pad. ๐ Anticollision Report High-density pad drilling with close wellbore proximity; requires precise directional control and real-time monitoring. |
2026-06-04 | Directional Drilling |
| Tier 3 |
Surface Use Agreement and Affidavit executed with surface owners (Barbara Olson & Sharen Nelson Revoc. Trust) effective December 1, 2025, for pad construction. ๐ Affidavit of Well Pad Location and Surface Use Agreement Surface access secured well in advance (6+ months before permit date), showing proactive land management and reduced surface risk. |
2025-12-01 | General Oilfield Services |
| Tier 3 |
Closed mud system with no cuttings pit required. ๐ Conditions of Approval Non-standard waste handling mandate; eliminates traditional cuttings pit, requiring alternative disposal (hauling to approved facility). |
Unknown | Mud / Fluids |
| Tier 3 |
Operator must contact NDIC Field Inspector Will Ryan (701-770-6684) prior to location construction. ๐ Conditions of Approval Explicit pre-construction contact requirement with a named inspector, indicating heightened regulatory oversight or site-specific sensitivities. |
Unknown | General Oilfield Services |
| Tier 3 |
Perimeter berm required surrounding entire location. ๐ Conditions of Approval Specific containment requirement beyond typical pad design; indicates environmental or runoff control concerns. |
Unknown | General Oilfield Services |
| Tier 3 |
Environmental studies for pad location to be completed Spring 2026 (noted on grading plan).โฐ TIME-SENSITIVE ๐ Well/Facilities Pad Grading Plan Note Environmental studies pending as of plan date (early 2026), representing a potential pre-construction contingency. |
Relative | General Oilfield Services |