| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval condition based on a production liner cemented in the lateral with a wet shoe and ability to frac out the shoe to satisfy a 150' east setback. ๐ Permit Stipulations - Conditions of Approval The permit's approval is explicitly conditioned on a specific, advanced completion design (cemented liner with wet shoe). This is a non-routine regulatory tie between permitting and detailed completion engineering. |
Unknown | Completions / Frac |
| Tier 3 |
Waiver request to NDIC (June 9, 2026) for adjacent unit notice requirements because Hess is also the operator of the adjacent spacing unit (BW-HELGA STENSETH).โฐ TIME-SENSITIVE ๐ Letter to Todd Holweger, NDIC Exploits regulatory efficiency by self-waiving inter-operator notice requirements, streamlining the permit process for a multi-well pad targeting units where Hess controls adjacent acreage. |
2026-06-09 | Regulatory / Permitting |
| Tier 3 |
Detailed, engineered well pad design by KLJ Engineering LLC includes specific compaction controls, material specs (e.g., clay berms), stormwater release structures, and interim/final reclamation plans. Dated drawings from Jan/Feb 2026.โฐ TIME-SENSITIVE ๐ Engineered Well Pad Design Plans (multiple sheets) Extensive, vendor-specific civil engineering package is integrated into the permit file. Shows advanced, prescriptive planning for pad construction and environmental management. |
2026-01-26 | General Oilfield Services |
| Tier 3 |
Surface Use Agreement affidavit (effective Dec 1, 2025) and 1320' notice letter to adjacent landowners (Pedersen) dated June 16, 2026, show recent land access secured.โฐ TIME-SENSITIVE ๐ Affidavit of Well Pad Location and Surface Use Agreement; Landowner Notice Letter Demonstrates recent and successful surface access negotiations, clearing a critical path for imminent construction. The notice letter is dated just before permit submission. |
2025-12-01 | General Oilfield Services |
| Tier 3 |
Affidavit from Hess Senior Manager (April 21, 2022) states Halliburton Energy Services, their stimulation supplier, does not use specified diesel fuels in HF activities, covering all wells for Hess Bakken Investments II, LLC. ๐ Hydraulic Fracturing Stimulation Affidavit A dated, company-wide affidavit pre-selects Halliburton as the stimulation supplier and locks in compliance with a specific regulatory memo (Feb 2014). This is a long-term vendor relationship signal. |
2022-04-21 | Completions / Frac |
| Tier 3 |
Hess provides a detailed anti-collision protocol including AC guidance from certified well planners, real-time corrected surveys, a 1.5 minimum separation factor, and active geo-steering with Gamma ray when cross-cutting laterals. ๐ Proposed Work / Anti-collision Goes beyond standard anti-collision statements. Outlines a formal, multi-layered engineering management process, indicating a high-density drilling environment with significant collision risk. |
Unknown | Directional Drilling |
| Tier 3 |
Operator must contact NDIC Field Inspector Will Ryan (701-770-6684) prior to location construction, indicating heightened regulatory oversight or specific site concerns. ๐ Permit Stipulations Direct, named inspector contact requirement is non-routine and suggests potential environmental, landowner, or operational sensitivities requiring pre-construction coordination. |
Unknown | General Oilfield Services |
| Tier 3 |
Operator asserts 'No' to well and production facility being on same pad, indicating separate facility location. ๐ Operator Assertions Diverges from common co-location practice. Requires separate construction, flowlines, and infrastructure planning, increasing scope and complexity. |
Unknown | General Oilfield Services |