๐Ÿ›ข๏ธ BW-Chad Allen-149-100-2826H-5

HESS BAKKEN INVESTMENTS II, LLC ยท McKenzie County, ND ยท File #43070 ยท Generated 2026-08-22 02:39

API
3305310838
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (8)

Tier Signal Date Service Impact
Tier 2 Approval conditional on 500' north/south and 150' east/west setbacks within 1920-acre spacing unit, with east setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe.
๐Ÿ“„ Stipulations section, first page
Specific setback conditions tied to completion design (wet shoe) are non-standard and indicate regulatory negotiation or geomechanical constraints.
Unknown Completions / Frac
Tier 3 Closed mud system with no cuttings pit required.
๐Ÿ“„ Stipulations section, first page
Mandates specific waste handling (closed system) rather than optional or pit-based disposal.
Unknown Mud / Fluids
Tier 3 Hess must contact NDIC Field Inspector Will Ryan at 701-770-6684 prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section, first page
Explicit pre-construction contact requirement with named inspector is a specific regulatory condition, not a generic rule.
Relative General Oilfield Services
Tier 3 Perimeter berm required surrounding entire location; must be constructed of predominantly clay material with specific compaction and moisture content specs.
๐Ÿ“„ Page 2 and Civil Plan Notes (Typical Sections)
Detailed engineering specifications for berm material (CL or CH soils, 60% passing #200 sieve, LL>30) exceed routine stipulations.
Unknown General Oilfield Services
Tier 3 Existing junk/farmstead and junk pile to be removed as part of pad construction.
๐Ÿ“„ Civil Grading Plan (Sheet 8) and Basis of Estimate
Site requires demolition and debris removal before pad construction, adding scope.
Relative General Oilfield Services
Tier 3 Dry Cuttings Pit (DCP) removal required: existing reclaimed cuttings pit materials and all impacted soils to be hauled to approved location.
๐Ÿ“„ Civil Plan Notes
Legacy waste remediation is part of the pad construction scope, not just new well drilling.
Relative General Oilfield Services
Tier 3 Proposed emulsion pipeline route from BW-Chad Allen Pad to BW-Barbara/Sharen Pad central facility shown on facility plot plan.
๐Ÿ“„ Facility Plot Plan
Infrastructure for multi-pad production handling is pre-planned, indicating centralized processing strategy.
Unknown General Oilfield Services
Tier 3 Environmental studies for pad location to be completed Spring 2026.โฐ TIME-SENSITIVE
๐Ÿ“„ Civil Grading Plan (Sheet 8)
Explicit future milestone for environmental work, indicating pad construction is contingent on study completion.
2026-Spring General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil Construction & Earthwork
Pad construction is pending environmental studies (Spring 2026). Contractors must meet highly specific material and compaction specs for clay berms, and handle demolition, DCP removal, and complex stormwater management structures.
Directional Drilling & MWD/LWD
Anti-collision requirements are stringent due to dense offset well environment. Service companies must provide high-frequency surveys, real-time anti-collision monitoring, and geo-steering capabilities to meet Hess's 1.5 separation factor standard.
Cementing & Completions
Permit condition requires production liner cemented with wet shoe and ability to frac out shoe. Cementing design must ensure zonal isolation in lateral and accommodate frac operations. Halliburton is pre-selected for stimulation.
Waste Hauling & Environmental Remediation
Closed mud system required, no cuttings pit. Existing DCP materials and impacted soils must be hauled off. Filter sock containers mandatory. Immediate need for waste handling and remediation services before and during drilling.
Pipeline Construction
Facility design includes planned emulsion pipeline to central facility. Future scope for pipeline contractors to tie this pad into Hess's production network.