| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditional on 500' north/south and 150' east/west setbacks within 1920-acre spacing unit, with east setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe. ๐ Stipulations section, first page Specific setback conditions tied to completion design (wet shoe) are non-standard and indicate regulatory negotiation or geomechanical constraints. |
Unknown | Completions / Frac |
| Tier 3 |
Closed mud system with no cuttings pit required. ๐ Stipulations section, first page Mandates specific waste handling (closed system) rather than optional or pit-based disposal. |
Unknown | Mud / Fluids |
| Tier 3 |
Hess must contact NDIC Field Inspector Will Ryan at 701-770-6684 prior to location construction.โฐ TIME-SENSITIVE ๐ Stipulations section, first page Explicit pre-construction contact requirement with named inspector is a specific regulatory condition, not a generic rule. |
Relative | General Oilfield Services |
| Tier 3 |
Perimeter berm required surrounding entire location; must be constructed of predominantly clay material with specific compaction and moisture content specs. ๐ Page 2 and Civil Plan Notes (Typical Sections) Detailed engineering specifications for berm material (CL or CH soils, 60% passing #200 sieve, LL>30) exceed routine stipulations. |
Unknown | General Oilfield Services |
| Tier 3 |
Existing junk/farmstead and junk pile to be removed as part of pad construction. ๐ Civil Grading Plan (Sheet 8) and Basis of Estimate Site requires demolition and debris removal before pad construction, adding scope. |
Relative | General Oilfield Services |
| Tier 3 |
Dry Cuttings Pit (DCP) removal required: existing reclaimed cuttings pit materials and all impacted soils to be hauled to approved location. ๐ Civil Plan Notes Legacy waste remediation is part of the pad construction scope, not just new well drilling. |
Relative | General Oilfield Services |
| Tier 3 |
Proposed emulsion pipeline route from BW-Chad Allen Pad to BW-Barbara/Sharen Pad central facility shown on facility plot plan. ๐ Facility Plot Plan Infrastructure for multi-pad production handling is pre-planned, indicating centralized processing strategy. |
Unknown | General Oilfield Services |
| Tier 3 |
Environmental studies for pad location to be completed Spring 2026.โฐ TIME-SENSITIVE ๐ Civil Grading Plan (Sheet 8) Explicit future milestone for environmental work, indicating pad construction is contingent on study completion. |
2026-Spring | General Oilfield Services |