๐Ÿ›ข๏ธ BW-Chad Allen-LN-149-100-2826H-1

HESS BAKKEN INVESTMENTS II, LLC ยท McKenzie County, ND ยท File #43071 ยท Generated 2026-08-22 02:40

API
3305310839
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Production liner uses cemented wet shoe design with ability to 'frac out the shoe' and intentional 2 bbl over-displacement of cement job
๐Ÿ“„ Completion Equipment section and Stipulations
Non-standard completion technique with specific engineering design for first-stage fracture initiation
Unknown Completions / Frac
Tier 3 Pad includes emulsion pipeline to BW-Barbara/Sharen Pad central facility and gas lift compressor infrastructure
๐Ÿ“„ Facility plot plan and details
Infrastructure integration with existing facilities indicates planned production handling and artificial lift strategy
2026-12-26 General Oilfield Services
Tier 3 Permit includes explicit anti-collision protocol with 1.5 separation factor minimum, real-time corrected surveys, and gamma ray geo-steering for cross-cutting laterals
๐Ÿ“„ Page 7 of 11, Proposed Work section
Reveals operator's systematic approach to managing high-density drilling environment with specific engineering controls beyond basic regulatory requirements
2026-06-25 Directional Drilling
Tier 3 Operator requested waiver from providing directional drilling plans to adjacent unit operator (Chevron) because Hess operates both the drilling unit and adjacent unit
๐Ÿ“„ Letter to NDIC dated June 9, 2026
Reveals complex unit ownership and operator coordination strategy; Hess controls multiple units enabling streamlined permitting
2026-06-09 Directional Drilling
Tier 3 Well pad designed with 12.42 acre disturbance area and engineered stormwater retention system capable of holding 39,852 barrels at spillway elevation
๐Ÿ“„ Civil design sheets, estimated quantities and stormwater release details
Large-scale pad construction with sophisticated water management infrastructure beyond typical pad designs
2026-01-26 General Oilfield Services
Tier 3 Surface use agreement executed December 1, 2025, with affidavit filed June 12, 2026, specifically addressing well pad location to prevent conflicting easementsโฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit of Well Pad Location and Surface Use Agreement
Proactive surface rights management with executed agreement well before permit submission
2025-12-01 Drilling Rigs

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil Construction & Earthwork
12.42 acre pad with engineered stormwater system requires immediate mobilization for grading, surfacing, and infrastructure installation per 2026 construction timeline
Directional Drilling & Survey Services
High-density drilling environment with anti-collision requirements creates demand for advanced directional services, real-time survey correction, and geo-steering expertise
Specialized Cementing & Completions
Cemented liner with wet shoe design and specific over-displacement requirements indicate need for specialized cementing services during completion phase
Pipeline & Facility Construction
Emulsion pipeline to central facility and gas lift compressor installation represent immediate infrastructure build-out opportunities