| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Well requires a 100' north setback due to production liner cemented in lateral with wet shoe and no ability to frac out the shoe ๐ Stipulations section, page 1 Unusual setback requirement tied to specific completion design (cemented liner with wet shoe) that limits stimulation options; indicates a deliberate engineering constraint that affects well placement and potential fracture geometry. |
Unknown | Completions / Frac |
| Tier 3 |
Operator submitted affidavit notifying adjacent spacing unit operator (Morningstar Operating LLC) per NDIC Order 31848 for wellbore entering Bakken system outside target unit ๐ Affidavit section at end of document Regulatory requirement triggered by wellbore traversing adjacent spacing unit; demonstrates active coordination with competitor operator and compliance with specific order. |
2026-06-10 | Drilling Rigs |
| Tier 3 |
Waiver requested for Acoustic/Sonic, Cased Hole, Casing Evaluation, and Cement Evaluation logs ๐ Proposed Logs section, page 3 Operator opting out of standard evaluation logs, which may indicate cost-saving or confidence in formation/casing integrity; requires separate sundry notice approval. |
Unknown | Regulatory / Permitting |
| Tier 3 |
Must drill in conjunction with another well meeting 1220' setback from east/west boundaries to justify spacing unit ๐ Stipulations section, page 2 Conditional approval requiring coordinated drilling of multiple wells to validate the spacing unit; creates interdependency between wells on pad. |
Relative | General Oilfield Services |
| Tier 3 |
Explicit prohibition of diesel-based compounds in hydraulic stimulation (listed CAS numbers) ๐ Proposed Work section, page 6 Operator proactively committing to diesel-free frac fluids, aligning with NDIC memo and potentially using alternative chemistries. |
Unknown | Completions / Frac |