โ† Back to Daily Permits

๐Ÿ›ข๏ธ Jilek 3-10H

Murfin Drilling Company, Inc. ยท Stark County, ND ยท File #43074 ยท Generated 2026-08-22 02:42

API
3308900920
Target Formation
Three Forks (Pronghorn)
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Well requires a 100' north setback due to production liner cemented in lateral with wet shoe and no ability to frac out the shoe
๐Ÿ“„ Stipulations section, page 1
Unusual setback requirement driven by cemented liner with wet shoe configuration, limiting completion flexibility
Unknown Completions / Frac
Tier 3 Wet shoe sub utilized to pump perforating guns down for stage 1 but NOT for wellbore stimulation
๐Ÿ“„ Wellbore Schematic annotations, page after drilling prognosis
Specific completion technique detail indicating planned perforation method
Unknown Completions / Frac
Tier 3 Waiver requested for Acoustic/Sonic, Cased Hole, Casing Evaluation, and Cement Evaluation logs
๐Ÿ“„ Geologic Information section, page 3
Operator seeking to avoid standard evaluation logging
Unknown Regulatory / Permitting
Tier 3 Must drill in conjunction with another well meeting 1220' setback from east/west boundaries to justify spacing unit
๐Ÿ“„ Stipulations section, page 2
Conditional approval requiring coordinated drilling with another well
Relative General Oilfield Services
Tier 3 Explicit prohibition of diesel-based compounds in hydraulic stimulation
๐Ÿ“„ Proposed Work section, page 6
Specific chemical restrictions beyond routine regulatory requirements
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil construction and pad building
Detailed construction drawings with specific cut/fill quantities and berm/ditch requirements; pad construction likely imminent
Non-diesel stimulation fluids
Explicit prohibition of diesel-based compounds creates opportunity for alternative stimulation fluid providers
Cementing services for wet shoe configuration
Unique cemented liner with wet shoe design requires specialized cementing expertise
Directional drilling with specific build rates
Detailed directional plan with 12ยฐ/100ft build rate and specific nudge requirements