โ† Back to Daily Permits

๐Ÿ›ข๏ธ Little Bit 161-91 18-7-6 4H-TF

Heberdev Operating, LLC ยท Burke County, ND ยท File #43075 ยท Generated 2026-08-22 02:42

API
3301302045
Target Formation
Three Forks First Bench
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Drillback notification waiver filed for 7 wells on pad due to adjacent spacing unit ownership
๐Ÿ“„ DRILLBACK NOTIFICATION WAIVER section
Operator preemptively waived 21-31 day neighbor notification requirements for frac operations
2026-06-29 Completions / Frac
Tier 3 Surface Use Agreement specifically allows for drilling of off-unit wells and includes saltwater disposal well
๐Ÿ“„ AFFIDAVIT AFFIRMING SURFACE USE AGREEMENT section
Agreement scope exceeds typical drilling rights to include SWD and off-unit drilling
2026-06-06 Drilling Rigs
Tier 3 North setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe
๐Ÿ“„ Stipulations section, page 1
Non-standard completion design (wet shoe) influences regulatory setbacks
Unknown Completions / Frac
Tier 3 Operator must contact NDIC Field Inspector Jason Hicks prior to location construction
๐Ÿ“„ Stipulations section, page 1
Pre-construction regulatory checkpoint creates a gate before any site work can begin
Unknown General Oilfield Services
Tier 3 Operator aware of existing Duperow wellbores in spacing unit and will use all means available to eliminate interference
๐Ÿ“„ PROPOSED WORK section, page 7
Explicit acknowledgment of legacy wellbore collision risks requiring mitigation
Unknown Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
Taktikal Directional already engaged but anti-collision concerns with Duperow wellbores may require specialized services
Waste Management & Disposal
Smoky Butte Environmental locked in for cuttings; filter sock container requirement creates ongoing waste handling needs
Pad Construction & Earthwork
13,760 cubic yards of excess material to be managed; pre-construction inspector contact required before any work begins
Cementing & Completion Services
Wet shoe completion design requires specialized cementing and frac-out capability