โ† Back to Daily Permits

๐Ÿ›ข๏ธ FEDOR 7-6 2HSF

Phoenix Operating LLC ยท Williams County, ND ยท File #43077 ยท Generated 2026-08-22 02:43

API
3310506844
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 South setback reduced to 150' (vs standard 500') based on production liner cemented in lateral with wet shoe and ability to frac out shoe
๐Ÿ“„ Page 1 of 11
Non-standard setback approval indicates engineered solution for pad optimization
Unknown Completions / Frac
Tier 3 U-turn horizontal well design with specific fracture stimulation approval requirements for portions within 500' of spacing unit boundary
๐Ÿ“„ Page 2 of 11
Requires pre-approval of fracture stimulation procedures and as-built survey submission before completion
2026-06-30 Completions / Frac
Tier 3 Adjacent spacing unit operator notification required per NDIC Orders 31848 & 31973 for wells entering Bakken system outside target unitโฐ TIME-SENSITIVE
๐Ÿ“„ Notarized affidavit dated June 16, 2026
Specific notification to Hess Bakken Investments with directional plans and timing
2026-06-16 Directional Drilling
Tier 3 BLM notification required for federal minerals in spacing unit - operator must contact BLM Dickinson officeโฐ TIME-SENSITIVE
๐Ÿ“„ Email from Daniel J. Kuchar dated October 15, 2025
Additional federal regulatory layer beyond state requirements
2025-10-15 General Oilfield Services
Tier 3 Well name changed from LORD 7-6 2HF to FEDOR 7-6 2HSF, indicating pad reconfiguration or acquisition activity
๐Ÿ“„ Multiple pages (plat, engineering plans, anti-collision report)
Name change suggests pad consolidation, asset transfer, or strategic rebranding affecting multiple wells on pad
2025-06-05 General Oilfield Services
Tier 3 No-perf zone designated from 20,377-22,131 MD (1,754 ft interval)
๐Ÿ“„ Section details diagram
Intentional exclusion of significant lateral section from stimulation
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling & MWD services
Complex U-turn well with specific survey requirements (100' vertical, 30' curve, 90' lateral); anti-collision critical with multiple offsets
Cementing services
Critical for 150' setback approval; requires production liner cementing with wet shoe and ability to frac out shoe
Regulatory compliance & permitting
Multiple regulatory layers: NDIC, BLM federal minerals, adjacent operator notifications, pre-completion approvals
Earthwork & pad construction
Detailed pad design with 11+ acres disturbance; construction must begin after 3rd business day following permit publication