โ† Back to Daily Permits

๐Ÿ›ข๏ธ Isabella 5993 14-1 2BX

OASIS PETROLEUM NORTH AMERICA LLC ยท Burke County, ND ยท File #43078 ยท Generated 2026-08-22 02:45

API
3301302046
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 1 Approval conditional on wellbore being located down north-south axis within 500' drilling corridor and no closer than 150' setback from north & south boundaries within 5120-acre spacing unit. North setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe.
๐Ÿ“„ Stipulations section, page 1
Imposes specific directional and geometric constraints on well placement, affecting drilling and completion design. The 'wet shoe' configuration is explicitly tied to regulatory approval.
Unknown Directional Drilling
Tier 2 Use of 'wet shoe' completion configuration: liner cement intentionally over-displaced by 7 barrels, creating ~400' of uncemented annulus at toe to allow pump-down of first stage perforating guns on wireline.
๐Ÿ“„ Wet Shoe section, page 11
A specific, non-standard completion technique chosen to avoid more expensive perforating methods (tubing or tractor). This is a deliberate design choice affecting cementing and stimulation.
Unknown Completions / Frac
Tier 3 Affidavit affirming Surface Use Agreement executed with landowner for off-lease drilling, dated June 30, 2026.
๐Ÿ“„ AFFIDAVIT AFFIRMING SURFACE USE AGREEMENT, page 15
Surface agreement is finalized and documented for drilling from a location outside the target spacing unit. Shows advanced surface land work is complete, removing a key pre-construction hurdle.
2026-06-30 General Oilfield Services
Tier 3 Drill-back notification provided to adjacent operator (Silver Hill Energy) via email on 6/25/2026, as required for off-spacing drilling.
๐Ÿ“„ AFFIDAVIT AFFIRMING DRILL-BACK NOTIFICATION, page 15
Demonstrates regulatory compliance and proactive communication with offset operator. Reveals the identity of the adjacent operator who was notified.
2026-06-25 General Oilfield Services
Tier 3 Anticipated Commencement Date: Jun 07, 2025. Drilling Days: Approximately 30 days.โฐ TIME-SENSITIVE
๐Ÿ“„ Anticipated Starting Dates section, page 7
Provides a specific planned start date and duration for drilling operations, which is not standard in permit data.
2025-06-07 Directional Drilling
Tier 3 Operator must contact NDIC Field Inspector Jason Hicks prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section, page 1
Mandatory pre-construction regulatory contact with a named individual. Indicates heightened oversight or specific site conditions requiring inspector awareness before work begins.
Relative General Oilfield Services
Tier 3 Operator has submitted sundries to cancel previously permitted wells on this unit, which are pending approval.
๐Ÿ“„ PROPOSED WORK section, page 6
Reveals a change in development plan for the unit. The operator is consolidating or altering its well program, canceling old permits in favor of this new pad/well design.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling & Directional Services
Specific start date (Jun 7, 2025) and ~30-day drilling window provided. Strict directional constraints (north-south axis, setbacks) and anti-collision protocols require precise execution.
Cementing
Non-standard 'wet shoe' liner cement job requiring intentional over-displacement. Specific centralizer program for surface casing. Cement top job required if fallback >10' below ground.
Completion & Stimulation
Wet shoe design dictates a wireline pump-down operation for Stage 1 perforating, affecting service selection. Frac design will be based on post-completion production rates.
Earthwork & Pad Construction
Mandatory contact with NDIC Inspector Jason Hicks required prior to construction. New pad construction with detailed earthwork quantities (78,100 CY excavation/embankment). Dikes and base must be impermeable.
Waste Hauling & Disposal
Operator has pre-identified a list of 8 licensed disposal facilities for dry cuttings. On-site leak-proof container for filter socks required from spud through flowback.
Surveying & Well Planning
Complex anti-collision environment with many offset wells. Survey frequency mandates (100' vertical, 30' curve, 90' lateral). Certified surveys must be submitted to NDIC email.