| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditional on 'wet shoe' completion design with cemented production liner in lateral to enable frac out of shoe, allowing 150' north/south setbacks vs. standard 500'. ๐ Page 1, Stipulations section Specific engineering design mandated by regulator to achieve tighter spacing, indicating a tailored completion strategy that deviates from standard casing/cementing. |
Unknown | Completions / Frac |
| Tier 3 |
Anticipated commencement date is June 7, 2025, with drilling days approximately 30.โฐ TIME-SENSITIVE ๐ Attachment section, 1.8 Anticipated Starting Dates Specific planned spud date provided in attachment, indicating near-term operational timeline. |
2025-06-07 | General Oilfield Services |
| Tier 3 |
Facility design uses an indirect heater with a setback exemption (Case No. 28949 Order No. 31500), allowing placement within 60' of wellhead and 21' of oil tank. ๐ Attachment section, FACILITY STATEMENT Non-standard regulatory variance for equipment placement, indicating pre-approved, compact facility design. |
Unknown | General Oilfield Services |
| Tier 3 |
Operator must contact NDIC Field Inspector Jason Hicks (701-720-3523) prior to location construction. ๐ Page 1, Permit Review Policy Explicit, named regulatory point of contact required before pad construction begins, indicating heightened oversight or site-specific conditions. |
Relative | General Oilfield Services |
| Tier 3 |
Operator has submitted sundries to cancel previously permitted wells on this unit, which are pending approval. ๐ Page 6, PROPOSED WORK section Indicates active permit portfolio management, replacing older plans with this new well design, showing persistent intent to develop the unit. |
Unknown | General Oilfield Services |