| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditional on wellbore being located down north-south axis within 500' drilling corridor and no closer than 150' setback from north & south boundaries within 5120-acre spacing unit. North setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe. ๐ Stipulations section, page 1 Specific geosteering and completion constraints imposed by Commission Order 35418, requiring precise wellbore placement and a 'wet shoe' completion design to manage boundary setbacks. |
Unknown | Directional Drilling |
| Tier 2 |
Detailed 'Wet Shoe' completion configuration described: 400 ft of uncemented annulus at liner toe, over-displaced by 7 barrels to enable wireline pump-down of first stage guns, avoiding more expensive tubing/tractor methods. ๐ Wet Shoe section, page 10 Explicit, non-standard completion design aimed at cost reduction for toe initiation. Reveals specific operational sequence and fluid displacement volumes. |
Unknown | Completions / Frac |
| Tier 3 |
Affidavit affirms Surface Use Agreement executed with landowner for off-lease drilling, and drill-back notification provided to adjacent operator (Silver Hill Energy) via email on 6/25/2026. ๐ AFFIDAVIT sections, end of document Confirms all surface and offset operator notifications are complete as of a specific recent date, clearing a major pre-drilling regulatory hurdle. |
2026-06-25 | General Oilfield Services |
| Tier 3 |
Anticipated Commencement Date: Jun 07, 2025. Drilling Days: Approximately 30 days.โฐ TIME-SENSITIVE ๐ Anticipated Starting Dates section, page 8 Specific planned spud date and duration provided in the well plan attachment, indicating operator's forward schedule. |
2025-06-07 | Drilling Rigs |
| Tier 3 |
Facility design uses an indirect heater with a setback exemption (NDIC Case No. 28949 Order No. 31500), allowing placement within 60 ft of wellhead and 21 ft of oil tank. ๐ FACILITY STATEMENT section, page 10 Non-standard facility layout enabled by a pre-existing regulatory variance. This pre-selected equipment choice impacts pad footprint and piping. |
Unknown | General Oilfield Services |
| Tier 3 |
Operator must contact NDIC Field Inspector Jason Hicks prior to location construction.โฐ TIME-SENSITIVE ๐ Stipulations section, page 1 Mandatory pre-construction field inspection contact, specifying the individual inspector (Jason Hicks). |
Relative | General Oilfield Services |
| Tier 3 |
Operator asserts they have previously permitted wells on this unit and have submitted sundries to cancel those permits, which are pending approval. ๐ PROPOSED WORK section, page 6 Reveals a change in well plan or pad layout, with regulatory paperwork (sundry notices) in flux. Indicates potential for last-minute adjustments or delays if cancellations are not finalized. |
Unknown | General Oilfield Services |