๐Ÿ›ข๏ธ Little Bit 161-91 18-7-6 3H-B

HEBERDEV OPERATING, LLC ยท Burke County, ND ยท File #43090 ยท Generated 2026-08-22 02:48

API
3301302058
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 North setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe
๐Ÿ“„ Page 1, Stipulations
Unusual completion design constraint tied to regulatory setback approval
Unknown Completions / Frac
Tier 3 Drillback notification waiver filed for 7 wells on pad due to operator owning adjacent spacing unitโฐ TIME-SENSITIVE
๐Ÿ“„ Drillback Notification Waiver section
Regulatory waiver eliminates 21-31 day notification period for frac operations
2026-06-29 Completions / Frac
Tier 3 Surface use agreement executed June 6th, 2026 covering all wells including SWD well at locationโฐ TIME-SENSITIVE
๐Ÿ“„ AFFIDAVIT AFFIRMING SURFACE USE AGREEMENT
Agreement specifically includes saltwater disposal well and off-unit drilling rights
2026-06-06 Drilling Rigs
Tier 3 Operator must contact NDIC Field Inspector Jason Hicks prior to location construction
๐Ÿ“„ Page 1, Conditions of Approval
Mandatory pre-construction contact requirement creates a regulatory gate that must be cleared before any site work begins
Unknown General Oilfield Services
Tier 3 Closed mud system with no cuttings pit required; cuttings to be hauled to Smoky Butte Environmental LLC
๐Ÿ“„ Page 1, Conditions of Approval and Page 5, DISPOSAL OF DRILL CUTTINGS
Specific waste disposal vendor pre-selected and mandated in permit conditions
Unknown Mud / Fluids
Tier 3 Operator acknowledges existing Duperow wellbores in spacing unit and will use all means available to eliminate interference
๐Ÿ“„ Page 6, PROPOSED WORK
Explicit recognition of legacy wellbore collision risks requiring mitigation
Unknown Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Survey
Complex anti-collision requirements with existing Duperow wellbores; precise trajectory needed for regulatory setbacks
Cementing & Completion
Wet shoe design with frac-out capability required by permit; production liner cementing critical for north setback compliance
Earthwork & Pad Construction
79,460 cubic yards of cut/fill balance required; pre-construction inspector contact mandatory before any work begins
Waste Management
Closed mud system mandated; cuttings disposal contract already awarded to Smoky Butte Environmental