| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe completion design with ability to frac out the shoe ๐ Stipulations and Completion Type note Completion design specified as 'Wet shoe with the ability to frac out the shoe.' This is a specific technical approach affecting cementing and stimulation operations. |
Unknown | Completions / Frac |
| Tier 3 |
Drillback waiver filed for multi-well pad, allowing surface location outside spacing unit and entry into adjacent unit ๐ Drillback Notification Waiver section Operator secured regulatory pre-approval to drill 7 wells from pad in Section 19 into adjacent spacing unit (Sections 6,7,18), bypassing standard notification requirements. This indicates a coordinated multi-well development strategy with complex pad positioning. |
2026-06-29 | Directional Drilling |
| Tier 3 |
Surface Use Agreement executed specifically for off-unit wells ๐ Affidavit Affirming Surface Use Agreement Agreement explicitly covers 'drilling of off-unit wells' at this location, not just standard operations. This is a proactive legal move enabling the drillback waiver strategy. |
2026-06-06 | Drilling Rigs |
| Tier 3 |
Closed mud system with cuttings hauled to specific licensed facility ๐ Stipulations and Disposal of Drill Cuttings section Permit mandates closed-loop system with cuttings hauled to Smoky Butte Environmental LLC (specific address provided). This is a non-routine environmental compliance requirement. |
Unknown | Mud / Fluids |
| Tier 3 |
Mandatory contact with specific NDIC Field Inspector prior to location constructionโฐ TIME-SENSITIVE ๐ Stipulations section Permit condition requires operator to contact Inspector Jason Hicks (phone number provided) before starting pad construction. This is an extra regulatory checkpoint. |
Relative | General Oilfield Services |