๐Ÿ›ข๏ธ Little Bit 161-91 18-7-6 7H-B

Heberdev Operating, LLC ยท Burke County, ND ยท File #43093 ยท Generated 2026-08-22 02:50

API
3301302061
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Wet shoe completion design with ability to frac out the shoe
๐Ÿ“„ Stipulations and Completion Type note
Completion design specified as 'Wet shoe with the ability to frac out the shoe.' This is a specific technical approach affecting cementing and stimulation operations.
Unknown Completions / Frac
Tier 3 Drillback waiver filed for multi-well pad, allowing surface location outside spacing unit and entry into adjacent unit
๐Ÿ“„ Drillback Notification Waiver section
Operator secured regulatory pre-approval to drill 7 wells from pad in Section 19 into adjacent spacing unit (Sections 6,7,18), bypassing standard notification requirements. This indicates a coordinated multi-well development strategy with complex pad positioning.
2026-06-29 Directional Drilling
Tier 3 Surface Use Agreement executed specifically for off-unit wells
๐Ÿ“„ Affidavit Affirming Surface Use Agreement
Agreement explicitly covers 'drilling of off-unit wells' at this location, not just standard operations. This is a proactive legal move enabling the drillback waiver strategy.
2026-06-06 Drilling Rigs
Tier 3 Closed mud system with cuttings hauled to specific licensed facility
๐Ÿ“„ Stipulations and Disposal of Drill Cuttings section
Permit mandates closed-loop system with cuttings hauled to Smoky Butte Environmental LLC (specific address provided). This is a non-routine environmental compliance requirement.
Unknown Mud / Fluids
Tier 3 Mandatory contact with specific NDIC Field Inspector prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section
Permit condition requires operator to contact Inspector Jason Hicks (phone number provided) before starting pad construction. This is an extra regulatory checkpoint.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
Complex multi-well trajectories from a single pad, with drillback waiver in place, indicate imminent need for precise execution. Taktikal Directional is already engaged in planning.
Earthwork & Pad Construction
Detailed pad layout and earthwork quantities (91,130 Cu. Yds. total cut/fill) are specified. Construction cannot start until inspector call (Jason Hicks). UELS has completed design.
Waste Hauling & Disposal
Closed-loop system mandated with cuttings going exclusively to Smoky Butte Environmental. This is a non-competitive, time-sensitive service tied to drilling operations.
Cementing & Completion Services
Specific wet shoe completion design requires specialized cementing. 'Ability to frac out the shoe' indicates a tailored stimulation approach.